Los Angeles, California building permit

26041-90000-35946

Issued

2649 E WASHINGTON BLVD — all permits at this address

-Install Three (3) Pedestal-Mounted 19.2KW, 240V, 1PH Level 2 EV Charging Stations. All EV Charging Stations shall have Built-In Load Management features.-Install 400A, 240/120V, 1PH, 3W Panel in NEMA 3R enclosure.-Install 300A, 2P Circuit Breaker in the existing Main Switchboard MSA Distribution Section.-Install Power Conductors and Conduits for all EV Charging Stations and Panelboard.-Install Ground Rod for the Panelboard. -Install Bollards, Wheelstops, and New Striping for Parking Spot

Status date2026-08-31
JurisdictionLos Angeles, California
SourceLos Angeles Open Data (LADBS)
Data freshnessOfficial city open data (LADBS)
View official record at LADBS Online Permit Lookup

Know the moment this permit moves.

Permit Ping checks this record daily and emails you when its status changes — reviews clear, corrections come back, inspections pass. Free for up to 3 permits.