Permits at 2649 E WASHINGTON BLVD

1 permit on file · Los Angeles, CA · from the official municipal record

-Install Three (3) Pedestal-Mounted 19.2KW, 240V, 1PH Level 2 EV Charging Stations. All EV Charging Stations shall have Built-In Load Management features.-Install 400A, 240/120V, 1PH, 3W Panel in NEMA 3R enclosure.-Install 300A, 2P Circuit Breaker in the existing Main Switchboard MSA Distribution Section.-Install Power Conductors and Conduits for all EV Charging Stations and Panelboard.-Install Ground Rod for the Panelboard. -Install Bollards, Wheelstops, and New Striping for Parking Spot · 2026-08-31

Monitoring a permit at this address?

Open any permit above and Permit Ping will watch it for you — a daily check of the official record with an email the moment the status changes. Free for up to 3 permits.