26041-10000-24815
PC Info Complete
(Eplan) Full power plan check for New electrical infrastructure for Level 3 EV chargers supporting electric Container Handling Equipment (CHE). Infrastructure includes several new ductbank, 3 Medium Voltage 4,160 Volt, Unit Substations (1500KVA, 2500KVA & 3750KVA) Supporting 29 Level 3 EV chargers, and smaller transformers supporting 13 new Level 2 EV chargers at multiple locations. The new added load is Approx 7,800 Amp at 480 Volt, 3Phase. · 2026-08-27
FIRE SPRINKLER TI. RELOCATE/ADD HEADS AND NEW PREACTION SYSTEM. · 2026-08-19
26020-10000-01307
Verifications in Progress
Eplan. (N) Reinforced concrete foundation pads to support the proposed electrical substation equipment. · 2026-08-08
AT THE OWNERS REQUEST, SUPPLY AND INSTALL ADDITIONAL CLEAN AGENT SYSTEM ZONE. SYSTEMSSHALL INCLUDE THE INSTALLATION OF AREA SMOKE DETECTION, MANUAL CONTROL DEVICES,AUDIBLE / VISUAL NOTIFICATION DEVICES, AGENT STORAGE CYLINDER(S), AND DISCHARGE PIPING.NEW DETECTION AND CONTROL DEVICES TO BE INTEGRATED WITH EXISTING FSCP.AREA SMOKE DETECTION SHALL BE INTERLOCKED WITH THE PRE-ACTION RISER FOR SOLENOIDACTIVATION. THE CONTROL PANEL SHALL MONITOR THE PRE-ACTION RISER TRIM DEVICES.PRE-ACTION RISE · 2026-07-20
[Eplan] Power plan check for the power connection to (4) new dual port EV chargers connected to existing electrical equipment. Methane Zone. · 2026-04-09
SCOPE OF WORK: RELOCATE (4) FIRE SPRINKLERS ON 3RD FLOOR WET SYSTEMAND ADD NEW PREACTION SYSTEM IN DATA ROOM 315A ON 3RD FLOOR WITH(8) FIRE SPRINKLERS, TOTAL: (12) NEW SPRINKLERS · 2026-04-07
Installation of new electrical panels, EV charging stations and relocation of 2000A switchboard to new location for container handling equipment (CHE).(7) 120KW level 3 EV chargers(2) 180KW level 3 EV chargers(4) 20KW level 2 EV chargers · 2025-12-22
[E-Plan] Plan check only. Supplemental to 25041-10000-18687. Changes to EV chargers 1-7 location and to remove communications conduits/pullboxes · 2025-10-31
25041-10000-27487
PC Info Complete
NEW DATA CENTER WITH REDUNDANT (N+1) EQUIPMENTONE SET OF UPS,TRANSFORMER, PANEL WILL BE ON NORMAL POWER AND AREDUNDANT SET WILL BE ON EMERGENCY POWER.1. TWO 200KVA 120/208V, 3, UPS UNITS2. TWO 225KVA 480V-120/208V, 3, 4W TRANSFORMER (HARMONIC RATED)3. TWO 600A, 120/208V, 3,4W, 60 SPACE PANELBOARD4. (14) 60A 208V RECEPTACLES TO FEED PDU'S IN RACKS FROM EACH PANEL.5. REMODEL WITH NEW LIGHTING AND CONTROLS.6. POWER FOR 2 NEW CRAC UNITS IN DATA CENTER.7. POWER FOR 2 NEW CONDENSING UNITS ON THE ROOF. · 2025-07-21