Permits at 8180 S RIVER PKWY

17 permits on file · Tempe, AZ · from the official municipal record

BP221738 CofO Issued

CONSTRUCT NEW PARKING STRUCTURE · 2025-08-19

ST230005 Closed

1. The southwest driveway and part of the south drive were moved south because of the addition of a yard south of blding S1. Requiring to also change the water, sewer and storm lines in that area. 2. A water line connecting to building S1 and the pavilion has been provided. 3. A Sewer line for the pavilion has been added. 4. A motorized sliding gate was added southwest of bldg. S1 on the south-north fire lane entrance. 5. A new fence has been added south of the volleyball and basketball c · 2025-02-11

WA220021 Closed

Project is part of the ASU Research Park ("ASURP") master development plan. Phase 1 consist of the development of 134,000 sf main building and 3 1/2 levels parking garage. Utility and drainage infrastructure are proposed to serve both phase-1 and future phases · 2025-02-11

UF230008 Closed

1. The southwest driveway and part of the south drive were moved south because of the addition of a yard south of blding S1. Requiring to also change the water, sewer and storm lines in that area. 2. A water line connecting to building S1 and the pavilion has been provided. 3. A Sewer line for the pavilion has been added. 4. A motorized sliding gate was added southwest of bldg. S1 on the south-north fire lane entrance. 5. A new fence has been added south of the volleyball and basketball c · 2025-02-11

DR240040 Closed

Drainage changes under Revision 4 RAE240010. · 2025-02-11

PV220016 Closed

Project is part of the ASU Research Park ("ASURP") master development plan. Phase 1 consist of the development of 134,000 sf main building and 3 1/2 levels parking garage. Utility and drainage infrastructure are proposed to serve both phase-1 and future phases · 2025-02-11

SW220016 Closed

Project is part of the ASU Research Park ("ASURP") master development plan. Phase 1 consist of the development of 134,000 sf main building and 3 1/2 levels parking garage. Utility and drainage infrastructure are proposed to serve both phase-1 and future phases · 2025-02-11

SW230008 Closed

1. The southwest driveway and part of the south drive were moved south because of the addition of a yard south of blding S1. Requiring to also change the water, sewer and storm lines in that area. 2. A water line connecting to building S1 and the pavilion has been provided. 3. A Sewer line for the pavilion has been added. 4. A motorized sliding gate was added southwest of bldg. S1 on the south-north fire lane entrance. 5. A new fence has been added south of the volleyball and basketball c · 2025-02-11

DR220015 Closed

Project is part of the ASU Research Park ("ASURP") master development plan. Phase 1 consist of the development of 134,000 sf main building and 3 1/2 levels parking garage. Utility and drainage infrastructure are proposed to serve both phase-1 and future phases · 2025-02-11

UF220013 Closed

Project is part of the ASU Research Park ("ASURP") master development plan. Phase 1 consist of the development of 134,000 sf main building and 3 1/2 levels parking garage. Utility and drainage infrastructure are proposed to serve both phase-1 and future phases · 2025-02-11

UF230012 Closed

Revision for Underground Fire Permit · 2025-02-11

RAE240018 Closed

4th Engineering Revision to the ASU research park project that is associated with: DS220920, and EN220060. The latest revision was approved through: RAE240010. · 2025-02-11

ST220011 Closed

Project is part of the ASU Research Park ("ASURP") master development plan. Phase 1 consist of the development of 134,000 sf main building and 3 1/2 levels parking garage. Utility and drainage infrastructure are proposed to serve both phase-1 and future phases · 2025-02-11

RAE230001 Closed

1. The southwest driveway and part of the south drive were moved south because of the addition of a yard south of blding S1. Requiring to also change the water, sewer and storm lines in that area. 2. A water line connecting to building S1 and the pavilion has been provided. 3. A Sewer line for the pavilion has been added. 4. A motorized sliding gate was added southwest of bldg. S1 on the south-north fire lane entrance. 5. A new fence has been added south of the volleyball and basketball c · 2025-02-11

RAE230020 Closed

The antenna yard, South of building S1 has been reduced in size, grading has been updated accordingly. · 2025-02-11

RAE240010 Closed

3rd Engineering Revision to the ASU research park project that is associated with: DS220920, and EN220060. · 2025-02-11

BP221431 Expired

At Risk Grading · 2023-07-28