New 2'' Landscape Meter (Meter box and tap was installed for 777 S Novus Project) · 2022-06-24
Widening of the sidewalk on the south side of University to accommodate the shoring for the bridge to be placed on the existing sidewalk. Paving Permit · 2021-04-30
Plaza Improvements at north landing for new University Drive Pedestrian bridge. Project impacts 4' right of way strip north of University Drive right of way. · 2020-12-22
Plaza Improvements at north landing for new University Drive Pedestrian bridge. Project impacts 4' right of way strip north of University Drive right of way.: Paving Permit · 2020-12-22