Backflow Replacement Febco 825YA 1.5" located on SW corner of building. · 2023-03-15
Spec TI buildout to prep for marketing to future tenants (entire building) · 2022-12-01
Addition of 4 loading dock doors and truckwell in back of building · 2022-10-25
G&D:
Addition of a loading dock with dock well at rear of existing industrial building and conversion of former employee parking area (for call center) to truck maneuvering and storage yard. Paving permit · 2022-09-29
G&D:
Addition of a loading dock with dock well at rear of existing industrial building and conversion of former employee parking area (for call center) to truck maneuvering and storage yard. · 2022-09-29
Non Structural Interior Demolition only · 2022-09-16