Offsite paving · 2025-04-10
Building connections for City utilities to a new multipurpose arena along Packard Drive, south of Rio Salado Parkway. · 2022-11-07
Building connections for City utilities to a new multipurpose arena along Packard Drive, south of Rio Salado Parkway. · 2022-11-07
Removal of a portion of an existing, public 8" water line that runs through the east portion of Lot 59. This portion of the water line will be replaced with an 8" water line running west from the south connection point to S. Packard Dr., a 12" water line running north along S. Packard Dr., and an 8" water line running east to the north connection point of the existing 8" water line. · 2022-11-07
Approx. 720LF new sewer main from Rio Salado to the future 3rd Street Alignment defined by the Novus innovation corridor master plan. Sewer to provide service to future development. · 2022-11-07
Building connections for City utilities to a new multipurpose arena along Packard Drive, south of Rio Salado Parkway. · 2022-11-07
On-site utilities services to new locker annex for ASU MPA · 2022-09-06
On-site utilities services to new locker annex for ASU MPA · 2022-09-06
On-site utilities services to new locker annex for ASU MPA · 2022-09-06
On-site utilities services to new locker annex for ASU MPA · 2022-09-06
Building connections for City utilities to a new multipurpose arena along Packard Drive, south of Rio Salado Parkway. · 2022-04-29
Revisions to the waterline relocation plans for the 8-inch water main within Lot 59 on the ASU Tempe campus. The existing 8-inch main will be rerouted around a proposed development parcel. The portion of the rerouted waterline within Packard Drive will be upsized to 12-inch. The revisions submitted herein are include moving the location of a fire hydrant, an air release valve, and two flushing valves. The easement has also been revised to accommodate these changes. · 2021-02-25