Construction of a turn lane on Rio Salado Parkway at its intersection with the APS Driveway. · 2025-12-15
PARCEL 4F - TI -LOBBY · 2025-07-18
Separated set of plans for the Novus 4F Turn Lane and APS Driveway as we are waiting for APS Agreement and decision from staff on the turn lane. · 2024-10-22
Grading & Drainage under RAE240007. · 2024-10-22
Separated set of plans for the Novus 4F Turn Lane and APS Driveway as we are waiting for APS Agreement and decision from staff on the turn lane. Permit for traffic signal conduit · 2024-10-22
Revision 2 to the Driveway Improvements to change tank from MC3500 to MC7200 and to just one tank system due to physical constraints in the field. · 2024-10-22
Revision to grading due to the APS infrastructure which was constructed higher than anticipated and existing asbuilt information. · 2024-10-22
CONSTRUCTION OF SHARED APS DRIVEWAY TO SERVE NOVUS PARCEL 4F OFFICE DEVELOPMENT PER DS 201181, EN 210110. MODIFY THE PLANS TO ADD UNDERGROUND RETENTION; MODIFY CURBING ON EAST SIDE TO NO CURB (MATCH EXISTING); MODIFY LIMITS OF CONSTRUCTION; ADD GATE AND CARD
READER AT APS ENTRANCE; ADD TRUNCATED DOMES AT ENTRANCE TO DRIVEWAY FOR FUTURE TRAFFIC SIGNAL; ADJUST LOCATION OF CONDUITS AND PULLBOXES FOR FUTURE TRAFFIC SIGNAL. · 2024-10-22
PARCEL 4F -AT RISK GRADING · 2023-09-14
PARCEL 4F -PHASED FOUNDATION FOR VIBRO PIER FOUNDATION · 2023-09-14
PARCEL 4F NEW THREE (3) STORY OFFICE BUILDING · 2023-09-13
Office Building with Parking Garage on 24 Acres with associated parking, utilities, and retention · 2023-08-09
Revision to the Plans to update the plans for the APS Driveway · 2023-08-09
Office Building with Parking Garage on 24 Acres with associated parking, utilities, and retention · 2023-08-09
REVISION 2 FOR PROJECT; AT APS' REQUEST: REMOVE SCREENWALLS. UPDATE PARKING LOT LIGHTING TO 12 FT POLES; MOVE ISLAND IN NORTHERN PARKING LOT; CHANGE
EQUALIZER PIPES FROM 8" HDPE TO 2-4" C-900 PVC WITH FLOWABLE FILL MATERIAL; REVISE VERTICAL CURB TO 6" ROLL CURB IN NORTHERN PARKING LOT (WITHIN APS EASEMENT · 2023-08-09
Revision to adjust building footprint. · 2023-08-09
Office Building with Parking Garage on 24 Acres with associated parking, utilities, and retention · 2023-08-09
Office Building with Parking Garage on 24 Acres with associated parking, utilities, and retention · 2023-08-09
REVISION 1 - MOVE PRIVATE MANHOLE SOUTH TO AVOID EXISTING ELECTRICAL LINE AND FUTURE FIBER
OPTIC LIN · 2022-10-10
PARCEL 4F -NEW THREE (3) STORY OFFICE BUILDING · 2022-03-16