M01333424-I1
Permit Issued
Modifications to the existing Sprinkler / Standpipe system on the BNY Lobby Level (1st Floor Entry) and atrium, as per plans. No change to use, egress, or occupancy. · 2026-09-11
M01358367-I1
Permit Issued
Removal and installation of perimeter sprinkler heads on Floors 3 -24 (BNY), as per plans. No change to use, egress, or occupancy. · 2026-09-10
M01308453-I1
Permit Issued
Structural modifications to the BNY Lobby Level (1st Floor) and related structural scope on Cellar, and Floors 1-22 and 25, as per plans. No change to use, egress, or occupancy. · 2026-08-24
M01283822-I1
Permit Issued
Structural work related to facade replacement as per plans. No change to use, egress, or occupancy. Related Job numbers: M01277287, M01283766 · 2026-08-20
M01427896-I1
Permit Issued
Structural remediation and reinforcement of deteriorated steel beam end connections and repairs at underside of deteriorated slab, at the 1st floor Loading dock and Parking area, as per plans. No change to use, egress, or occupancy. · 2026-08-05
M01308436-I1
Permit Issued
Removal of non-load bearing partitions, ceilings, & elements as per plans. Removal of a column & slab opening at the lobby entry. Modifications to the layout & finishes primarily at the 1st Fl entry with modifications to the cellar, 2, 3, 4 floors. · 2026-08-04
M01292629-I1
Permit Issued
Alt CO to establish new uses and Amenity Public Assembly Space on Cellar floor. · 2026-07-15
M01283766-I1
Permit Issued
Mechanical replacements and work, as per plans, as part of associated facade replacement. No change to use, egress, or occupancy. · 2026-07-15
M01277287-I1
Permit Issued
Facade replacement, as per plans. No change to use, egress, or occupancy. · 2026-07-14
M01277287-S1
Permit Issued
Partial Demolition of facade for building, interior demolition for facade demolition and removal of roofing at all roofs. This is a subsequent filing as per the approved application M01277287-I1. · 2026-07-01
M01358198-I1
Permit Issued
Modifications and additions of plumbing fixtures and piping on the BNY Facade as per plans. No change to use, egress, of occupancy. · 2026-06-22