M01446638-I1
Permit Issued
Installation of new partitions, doors, ceilings and finishes on the 22nd floor (Newrez) as per plans. No change to use, egress or occupancy. · 2026-09-11
M01446683-I1
Permit Issued
Installation of a new HVAC system on the 22nd floor (Newrez) as per plans. No change to use, egress or occupancy. · 2026-09-11
M01252546-I1
Permit Issued
Modify existing ductwork for new lobby footprint, provide heating within vestibules and lobby, refurbishment of existing air handler, and installation of new air handler and unit heater to serve lobby space. · 2026-09-09
M01255227-I1
Permit Issued
Design of the steel canopy framing system, including connection details for attaching the canopy and curtain wall supports to the existing building's structural steel. · 2026-09-09
M01252519-I1
Permit Issued
Scope to include new storefront and marquee at Broadway main lobby entrance, new storefront at 50th Street secondary lobby entrance, associated structural modification, new mechanical room at 2nd floor, and interior work. · 2026-09-04
M01278678-I1
Permit Issued
TEMPORARY OVERHEAD PROTECTION AS PER DRAWINGS. OVERHEAD PROTECTION SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. · 2026-08-20
M01440790-S1
Permit Issued
HEAVY DUTY SIDEWALK SHED DURING EXTERIOR WORK FILED UNDER APPLICATION # M01365247. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. · 2026-08-06
M01406156-I1
Permit Issued
Mechanical demo on 2nd and 3rd floor as per plans filed herewith. No change to use, egress, or occupancy. · 2026-08-06
M01440790-I1
Permit Issued
TEMPORARY PIPE SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. · 2026-08-05
M01406148-I1
Permit Issued
DEMO OF METAL STAIR FROM 2ND TO 3RD FLOOR AND MEZZANINE SLAB AND STEAL BEAMS AT INTERMEDIATE LEVEL BETWEEN 2ND AND 3RD FLOOR. INFILL OF SLAB OPENINGS ON 2ND AND 3RD FLOOR WITH NEW SLAB SUPPORTED BY STEEL BEAMS. NO CHANGE TO USE,EGRESS,OCCUPANCY · 2026-08-05
M01416881-S3
Permit Issued
Sprinkler work as shown on plans filed herewith. · 2026-07-27
Installation of a temporary work platform as per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application · 2026-07-17
M01416881-S2
Permit Issued
Plumbing work as shown on plans filed herewith. · 2026-07-15
M01406153-I1
Permit Issued
Removal of plumbing and sprinkler fixtures and installation of temporary sprinkler heads. No change in use, egress, or occupancy · 2026-07-10
M01416881-S1
Permit Issued
Mechanical work as shown on plans filed herewith. · 2026-07-01
M01406151-I1
Permit Issued
Removal of interior non- load-bearing partitions doors and millwork. No change to use, egress or occupancy · 2026-06-30
M00993912-I1
Permit Issued
Install temporary shoring to support deteriorated sections of the reinforced concrete slab. · 2026-06-30
M01416881-I1
Permit Issued
Demo and construction work on interior partitions and shown on plans filed herewith. · 2026-06-30
M01241809-I1
Permit Issued
Modification of sprinkler heads as shown on plans. 44th floor: (1) head relocated 45th floor: (1) head relocated (2) heads removed 46th floor: (5) heads replaced No change to use, egress or occupancy. · 2026-06-23