[E-Plan](PC Only) delta 2 changes only relocation of equipment New Construction Roof Mounted PV Solar 3.08kW DC - Revision relocating Main Service Panel and Solar Equipment · 2026-09-09
PLAN CHECK ONLY. REVISION TO PREVIOUSLY APPROVED PLANS UNDER 25042-10001-21353. REVISION TO SUMP PUMP CALCULATIONS AND LOCATION. COMBO PERMIT FEES UNDER 25010-30000-04970 · 2026-06-29
2025 WILDFIRE REBUILD, SUPPLEMENTAL PERMIT TO 25030-30000-07121 TO REVIEW LOCATION OF SWIMMING POOL AND SUM PUMP NO CHANGE IN GRADING QUANTITIES, INELIGIBLE · 2026-06-04
***2025 WILDFIRE PROJECT*** PLAN CHECK ONLY. REVISION TO PREVIOUSLY APPROVED PLANS TO RELOCATE SUMP PUMP AND UPDATE CALCULATIONS. COMBO PERMIT FEES UNDER #25010-30000-04970. · 2026-05-18
NEW FIRE SPRINKLER SYSTEM PER NFPA 13D. 1'' DOMESTIC USAGE WATER METER & BACKFLOW DEVICE. · 2026-03-10
(Eplan): Revision to approve set. 25041-10000-58710. PC by Andrew Dang, ***Applicant***We are doing a module swap for these plans. From 410W module to 440W module. · 2026-03-09
*** AFFECTED BY THE 2025 WILDFIRES ***PLAN CHECK ONLY. INSTALLATION OF A DUPLEX SUMP PUMP SYSTEM. COMBO PERMIT FEES UNDER #25010-30000-04970. · 2026-01-28
[ePlan] new PV System roof mount on PV1: (7) Modules of 410 W, Total: 2.87 kWdc (7) Inverter of 300 W, Total: 2.1 kWac1xStringPanel: (1) 125A (comb) · 2025-12-30