Temporary Generator · 2026-09-01
Please reopen original permit so it can be re-released for LADWP.Original permit number 25041 - 10000 - 27770Original Description: [ePlan] new PV System on a commercial building undergoing a major remodel: (64) Modules of 545 W, Total: 34.88 kWdc (1) Inverter of 25000 W, Total: 25kWac 6xString · 2026-07-17
Tenant improvement to existing catering facility to include kitchen expansion on first level and change the use from on 2nd level from office to dry goods and freezer storage capacity/breakroom. Reduce two parking stalls due to transformer placement. Building to be equipped with automatic sprinklers system hours of operation from 7am to 11pm. · 2026-05-22
HVAC T.I. INCLUDES: GENERAL HVAC, (4) TYPE I HOOD SYSTEMS (8 HOODS); (1) TYPE II HOOD SYSTEM AND MAKUP AIR UNITS. · 2026-04-14
[EPLAN] New 1000AMP Kohler Transfer Switch with New 800AMP Try-star Generator Docking Station. Generator is not part of permit. · 2026-04-13
Installation of hydraulic elevator · 2026-03-22
REVISION TO APPROVED PLANS UNDER 24042-10000-04550 & 24042-1000104550.CHANGES TO POTABLE WATER AND MEDIUM PRESSURE GAS ONLY TO INCLUDE WASHING MACHINE, TWO SINKS AND TANKLESS WATER HEATER. NO CHANGE IN DESIGN BASIS. · 2026-02-06
PLUMBING TI. WORK INCLUDES POTABLE WATER AND MEDIUM PRESSURE GAS SYSTEMS. (E) 2" WATER METER, 2" RP. · 2026-02-06
INSTALLATION OF NFPA 13 SYSTEM. 6" FIRE METER, 6" BACKFLOW PREVENTER. · 2026-01-09
Installation of hydraulic elevator · 2025-12-31
[ePlan] new PV System on a commercial building undergoing a major remodel: (64) Modules of 545 W, Total: 34.88 kWdc (1) Inverter of 25000 W, Total: 25 kWac6xString · 2025-12-29
E-plan. Replacement of 2000 amp 208/120V 3phase 4W Electrical Service, new panels, new power and lighting for T.I design to commercial kitchen. Existing building. Plan check for power and energy. · 2025-12-24
Installation of hydraulic elevator · 2025-12-17
FURNISH AND INSTALL NEW FIRE ALARM SYSTEM FOR 3 STRORY BUILDING · 2025-12-03
Relocate elevator recall devices to elevator rooms, no devices added. · 2025-10-27
match the field installations. Revised the power requirements for the elevators to match the submitted shopdrawings. The emergency panel EM was delivered into two sections. The total number ofbreaker poles is still the same. · 2025-09-26