(Eplan) Installation of a new combination motor starter for shore power receptacle at existing sub 409 switch rack. Conduit power routing from existing sub 409 switch rack to the location of the new 480V, 100A shore power receptacle. **Methane Zone - Hazardous Site** · 2026-09-10
Structural works associated with the project includes the design and construction of foundations and structural support systems required for the installation of new & improved process and electrical equipment. Major improvements include:New reinforced concrete pipe sleeper foundations for process piping systems.New and modified access platforms.New E-Z Line pipe supports foundations.New steel T-support framing and foundations for process piping and utility systems.New structural steel access pla · 2026-09-03
CONNECT TEMP GENERATOR TO EXISTING MOTOR CONTROL CENTER · 2026-08-27
[EPLAN] Full plan check for a Med Voltage Installation. Scope of work includes INSTALLATION OF (1) PRE FABRICATED POWER DISTRIBUTION CENTER (PDC) , INSTALLATION OF (1) 750KVA, 2.4KV/480V TRANSFORMER & (1) 1500KVA, 2.4KV/480V TRANSFORMER. AND THE INSTALLATION OF POWER & CONTROL CABLES FOR (5) MV MOTORS & (18) LV MOTORS AND MISCELLANEOUS LOADS. · 2026-07-30
25041-10000-55992
PC Info Complete
Medium Voltage installation of temporary transformer, temporary 2.4kV MCC and cable to feed east side electrical loads. · 2026-02-12