SUPPLEMENTAL PLAN CHECK FOR DELTA 5. SMOKE CURTAINS ADDED TO PLANSDEDICATED FIRE ALARM BATTERY BACKUP CIRCUIT ADDED. ELEVATOR MACHINE ROOM A/C SYSTEM UPDATED AND SERVICE RECEPTACLE ADDED. FITNESS ROOM LIGHTING UPDATEDSMOKE/FIRE DAMPERS AND FRESH AIR UNITS UPDATED ON PLANS.ROOF STAIRWELL LIGHT ADDED · 2026-08-27
Install 6 antennas, one communication panel and two (2) control devices (DAS System). · 2026-08-24
(Eplan) Supplemental Plan Check to update plans to reflect what is installed on siteChanges are as follows:E-2Loads updated for new A/C equipmentElevator breaker and ground size updatedLoads shown for TEL/TV IDF closet receptaclesLoad shown for Elevator equipment room A/CLoad shown for future courtyard lightingE-3Light added in front of elevator doorLight added in center of stairwellsJ Boxes shown for future courtyard lightingElevator equipment room A/C power shown on planTV/TEL IDF closet power · 2026-08-24
E-plan. New 37 Unit 4 story apartment 1200A Service 208v 3 phase · 2026-08-24
INSTALLATION OF FIRE SPRINKLER SYSTEM PER NFPA-13. INCLUDES STANDPIPES AND SEISMIC BRACING. · 2026-08-17
GENERAL HVAC. · 2026-08-17
EPLAN Grading- Removal and Recompaction for a 4-Story 36-Unit Apartment (1767 cu yds). · 2026-08-13
23010-10006-03155
PC Info Complete
EPLAN SUPPLEMENTAL TO PLAN TO PERMIT #23010-10000-03155 TO CHANGE STRUCTURAL ENGINEER ON RECORD, NO CHANGES TO THE PLAN. · 2026-08-13
POTABLE WATER, WASTE/VENT, AND RAINWATER DRAINAGE SYSTEM. TWO 2" DOMESTIC WATER METERS AND NO BACKFLOW PREVENTER. · 2026-07-06
Plan check for hydro electric elevator. · 2026-07-05
2 WAY COMMUNICATION SYSTEM - 1 COMMAND UNIT + 4 CALL STATIONS · 2026-06-30
[ePlanLA] Installation New Fire Alarm System for apartment - 4 stories 36 units. 143FAD + 1FACP · 2026-06-30
Low Voltage pre-wiring for 36 apartment units.Telephone entry system. CCTV camera system. · 2026-06-30
Pressure vessel · 2026-04-09
(eplan) Plan check only. Plan Check for Delta 6 and Delta 7 changes.Delta 6 Changes: Elevator wire and conduit size updatedDelta 7 Changes: Wire size feeding MS2 section updatedAttn Plan Checker: Miko Ghazaian · 2026-03-04
25041-10000-49409
Verifications in Progress
(EPlan) PV for installation of roof mounted solar panels on mixed building. Residential and business (OCCUPANCY GROUP: R-2/B/A-3/S-2). PV system includes 36 modules with 36 microinverters and 125A load center connected to existing main service panel. System size is 20.89kW DC/17.28kW AC. · 2025-11-21
PLAN CHECK ONLY. REVISION TO PREVIOUSLY APPROVED PLAN 23042-10002-20056. ADDED WATER SUB METERS TO RISER DIAGRAM AND REVISED HYDRAULIC CALCS. · 2025-03-27