PROJECT CONSISTS OF INSTALLING NEW AIR TERMINAL UNITS AND UPDATING 2ND FLOOR AIR DISTRIBUTION SYTEM.PROVIDE AIR TERMINAL UNITS AND ASSOCIATED DUCTWORK, DIFFUSERS, REGISTERS, GRILLES, AND HYDRONIC PIPING.BALANCE SYSTEM AND PROVIDE A FINAL REPORTUPDATE SEQUENCE OF OPERATIONS FOR THE ZONE SYSTEMS. · 2026-07-13
Installation of closed loop CHW system with a single dedicated Chiller. Swap out of Existing Air Handling unit on roof of building. Connect new CHW system to New Air Handling Unit. · 2026-06-29
INSTALL NEW FIRE ALARM DEVICES TO AN EXISTING FIRE ALARMSYSTEM ON THE ROOF, AT CEDARS SINAI MEDICAL CENTERSTEVEN SPIELBERG BUILDING. · 2026-06-01
INSTALL NEW FIRE ALARM DEVICES TO AN EXISTING FIRE ALARM SYSTEMON THE 1ST FLOOR, AT STEVEN SPIELBERG BUILDING, CEDARS SINAIMEDICAL CENTER. · 2026-05-12
INSTALL NEW FIRE ALARM DEVICES TO AN EXISTING FIRE ALARMSYSTEM ON THE 2ND FLOOR, AT CEDARS SINAI MEDICAL CENTERSTEVEN SPIELBERG BUILDING. · 2026-05-12
[E-Plan]. POwer plan check. Hazardous and methane zone 1. DEMOLITION OF EXISTING TRANSFORMER FEEDING EXISTING CHEMICAL WASTE STORAGEROOM PANEL.2. PROVIDE NEW DISTRIBUTION PANELS.3. RELOCATE .4. RE-FEED EXISTING CHEMICAL WASTE STORAGE ROOM PANEL FROM NEW DISTRIBUTIONPANEL. · 2026-02-17
FIRE SPRINKLER T.I. · 2025-09-11
E-plan. Install new load. Existing service and panels. Plan check for power. · 2025-08-19
25041-10000-05824
PC Info Complete
E-PLAN, PROVIDING POWER TO A NEW PERMENANT AIR HANDLING UNIT BEING INSTALLED ON THE ROOF OF THE STEVEN SPIELBERG BUILDING, AND A NEW CHILLER WITH ASSOCIATED PUMPS PROVIDED IN THE MECHANICAL YARD AREA. THIS POWER FOR THE ADDED MECHANICAL EQUIPMENT IS PROVIDED FROM THE EXISTING ELECTRICAL SYSTEM. · 2025-04-22
[eplan] PROVIDE POWER TO PRE-INSTALLED ELECTRICAL PANEL PROVIDED AND INSTALLED BY THE PREFABRICATED HAZARDOUS WASTE STORAGE ROOM'S MANUFACTURER.INTERCEPT AND RE-ROUTE PORTION OF UNDERGROUND POWER FEED TO GATE MOTORPROVIDE CONDUIT BETWEEN DATA ROOM AND PREFABRICATED HAZARDOUS WASTE.PLAN CHECK FOR POWER. · 2025-04-03