SUPPLEMENTAL TO PERMIT #25046-10000-01178 TO CHANGE ADDRESS FROM 832 S WESTLAKE TO NOW READ 831 S WESTLAKE AVE · 2026-08-29
[EPLAN] PLAN CHECK FOR CHANGES TO AN APPROVED SET OF PLANS, CHANGE INCLUDE REIVIONS TO SONGLE LINE TO SHOW THE ADDITION OF A NEW 600 SWITHCBOARD THAT FEEDS A NEW FIRE PUMP AND ASSOCIATED JOCKEY PUMP, CHNAGES ALSO INCLUDE UPSING ON ALL TENANT BREAKERS FROM 80A TO 125A, ALL OTHER CHANGES ARE CLOUDED AND A NARRATIVE IS PROVIDED. · 2026-08-19
Low voltage conduit, boxes, and wiring in units · 2026-08-19
36kW generator grounding. · 2026-08-19
Area of Refuge/Two Way Communications - 1 command center and 16 call boxes. · 2026-08-19
[eplan] New fire alarm system for apartment building. 1 FACP, 213 FA devices · 2026-08-19
Public Safety DAS System - BDA with 8 antennas · 2026-08-19
DAS Conduit on 1st Floor · 2026-08-19
[EPLAN] Full plan check for a new Apartment building. Scope of work includes new 2500 Amp, 120/208V, 3ph service, 79 unit panels, house panels and lighitng. Total energy Indoor sq.ft. 33772.******************************************************************************APPLICATION WAS ACCEPTED WITHOUT PANEL SCHEDULES FOR HL, HP, HP1, HH, AND EVC. ADD CIRCUITS TO FINAL FEES. · 2026-08-19
SUPPLEMENTAL TO PERMIT # 23041-90000-50126, 97 Low Voltage wallplates for TV/Data in 5th, 6th & 7th floors · 2026-08-19
Eplan. Supplemental to permit 18010-10000-04038 to revise the structural details. · 2026-08-14
Eplan. Supplemental to permit 18010-10000-04038 to revise roof plan to add rooftop pavers and pedestal system to the occupied areas and revise open space and landscape plans, and relocate transformer pad in the front yard. · 2026-08-14
***Previous PC Hassan Itani, and MANOUCHEHR SHAHRESTANI** Revision of low pressure gas system. Revision to previously approved plan 21042-10003-10204. **Note to PC: previously approved plans on ePlan** · 2026-07-27
PLAN CHECK ONLY. PERMIT FEES PAID UNDER 21044-10000-04792. REVISION TO PREVIOUSLY APPROVED PLANS UNDER #21044-10000-04792. REROUTED DUCTWORK; RELOCATE GARAGE EXHAUST FAN AND REMOVED FSD IN FAN COIL UNITS IN THE CORRIDORS. · 2025-08-25
21041-10003-31141
Quality Review Completed
[E-Plan] Delta 7 changes to approved set. Revision to approved electrical plans. Please see attached narrative for the list of changes. Please expediate the plancheck review. · 2025-06-11
21042-10001-10204
PC Info Complete
**OG PC: HASSAN ITANI***REVISIONS TO PREVIOUSLY APPROVED PLANS UNDER #21042-10000-1020. REVISIONS TO POTABLE WATER ONLY. ADDING A BOOSTER PUMP AND REVISING WATER HEATER/EQUIPMENT***For revisions to domestic branch risers. Addition of booster pump system, replacement of water heater with three new heaters, and addition of associated equipment including expansion tanks, mixing valves, and submeters. Revision to previously approved permit.*** PC TO UPDATE WORK DESCRIPTION ACCORDINLY. · 2025-04-15