26044-10000-09540
Submitted for Quality Review
INSTALLATION OF EXHAUST/SUPPLY FANS. ****FANS FOR LADWP VAULT ROOM AND ELECTRICAL ROOMS. EXISTING HIGHRISE. APPLICANT STATES THEY WILL PROVIDE A RATIONAL ANALYSIS AS PART OF THE FULL BUILDING TI. PLAN CHEKCER PLEASE VERIFY****Providing a new ventilation fan to provide the required ventilation to cool the Tranformer Room (LADWP). Adding Transfer Air Fans to the Electrical and MUSS rooms. · 2026-09-10
26016-10000-13983
Verifications in Progress
Attn: Farshad Alimohamadi & Daniel ChanStructural Basis of Design summarizing the approach and methodology for evaluating and modifying the existing structure at 801 South Broadway to support the proposed adaptive reuse program. The intent of this effort will be to verify that the building can safely accommodate the revised occupancy and architectural modifications while maintaining compliance with current governing codes.Attention: Farshad Alimohamadi and Daniel Chan whom are expecting this sub · 2026-08-11
26041-10000-28702
Verifications in Progress
(Eplan) Fire Alarm Drawings. Scope of Work includes (1) FACP and (14) Fire Alarm devices. · 2026-08-05
26041-10000-26848
Quality Review Completed
LADWP ELECTRIC SERVICE CONSTRUCTION ON THE FIRST FLOOR, LIGHTING, POWEFR in ELECTRICAL ROOMS, POWER TO MECHANICAL EQUIPMENT IN SUB-BASEMENT LEVELFire alarm plans will be reviewed on a separate submittal. · 2026-07-20
14016-10017-23836
Quality Review Completed
supp to #14016-10000-238361ST FLOOR INTERIOR AND EXTERIOR ALTERATION TO INSTALL NEW LADWP AND SUPPORTING LADWP ROOMS AT GROUND FLOOR LOADING DOCK AREA SO THAT LADWP MAY INSTALL TRANSFORMER AND SWITCH ROOM TO PROVIDE PERMANENT POWER ONSITE. NO CHANGE OF USE, FAR OR GROSS AREA CHANGES FROM CURRENT EXISTING CONDITION. · 2026-06-30