Permits at 800 WORLD WAY

3 permits on file · Los Angeles, CA · from the official municipal record

THE SCOPE OF WORK CONSISTS OF INSTALLING NEW FLUORO-K (FK-5-1-12) CLEAN AGENT SYSTEM AT LAX TERMINAL 8 BASEMENT LEVEL ELECTRICAL RM SVCS 134. THE FLUORO-K CLEAN AGENT PANEL SHALL BE KIDDE FIRE - ARIES MLX CONTROL PANEL. THE ROOM WILL BE PROTECTED WITH A MAIN SUPPLY OF FLUORO-K AND A CONNECTED RESERVE SUPPLY.ACTIVATION OF THE FLUORO-K SYSTEM SHALL BE MANUAL OR AUTOMATIC UTILIZING AIR SAMPLING DETECTION SYSTEM.FIRE PROTECTION DEVICES SHALL BE COMPATIBLE AND LISTED WITH IT'S CONTROL EQUIPMENT. · 2026-09-02

NEW LIGHTING AT LAWA: TERMINALS 1 THROUGH TERMINAL 7 AND AT TBIT. ARRIVALS ; GARAGE CORE ELEVATORS ; DEPARTURE ; THEME BUILDING CANOPY 480566 SFT AND FACADE 108576 SFT PLAN · 2026-08-11

21041-10000-23418 Permit Expired

Power plan check only. Project scope includes (1) NEW 4000A Switchboard section fed from Existing LAX Terminal 8 Switchboard for "DAS Headend" Facility. · 2026-05-21

Monitoring a permit at this address?

Open any permit above and Permit Ping will watch it for you — a daily check of the official record with an email the moment the status changes. Free for up to 3 permits.