Supplemental to 22010-10000-06311 to capture changes to approved plans: A110:STORAGE 143 OMITTED SHAFT. IDF ROOM 140 (2 HR) RATED WALLS; 90 MINUTES, DOOR.A120:IDF ROOM 243 (2 HR) RATED WALLS. OMIITED SHAFT IDF ROOM 240 (2 HR) RATED WALLS, 90 MINUTES RATED DOORA130:IDF ROOM 343 (2 HR) RATED WALLS. OMITTED SHAFTIDF ROOM 340 (2 HR) RATED WALLS, 90 MINUTE RATED DOOR.A140:IDF ROOM 443 (2 HR) RATED WALLS. OMITED SHAFTIDF ROOM 440 (2 HR) RATED WALLS, 90 MINUTE RATED DOOR.A800:DOORS 243, 343, 443 (90 MI · 2026-05-19
ePlan. Supp. to 22010-10000-06311 to install solar panels on roof level. · 2026-05-19
Supplemental permit to 22010-10000-06311:To revise wall ratings at **IDF 140, IDF 240/243, IDF 340/343, IDF 440/443**, and **MPOE 129C** per field changes to accommodate **DAS routing**, including revised wall types at the **MPOE Room (129C)** and a new shaft at **Storage Room (143)**. · 2026-05-19
Pressure vessel · 2026-05-04
INSTALLATION OF NFPA 13 SPRINKLERS AND STANDPIPE SYSTEM. 4-INCH FIRE METER WITH 4-INCH BACKFLOW DEVICE · 2026-04-28
HVAC SYSTEMS FOR APARTMENT BUILDING. · 2026-04-22
[EPLAN] PV2 New Solar System install on the roof of the aparment building. PV system size is 31.32 KW DC/28.377 KW AC CEC. scope of work consists of (58) pv modules with (15) microinverter and a pv load center · 2026-02-10
[EPLAN] FULL POWER AND ENERGY PLAN CHECK FOR A NEW 4 STORY 90 UNIT APARTMENT BUILDING WITH A NEW 2,500A MAIN SERVICE. BLDG PERMIT: 22010-10000-06311 · 2026-02-10
(ePLAN): SUPPLEMENTAL CHNAGE FOR PREVIOUSLY APPROVED PERMIT #23041-10000-55493 Revision to approved plans, per inspector's request. Adding a separate NGOM for utility and disconnect and a 45kva transformer.Expedited plan · 2026-01-09
NEW PLUMBING SYSTEM. PLAN CHECK FOR POTABLE WATER AND WASTE AND VENT. INCLUDES A 3" WATER METER AND A 4" BACKFLOW DEVICE. · 2025-11-05
INSTALLATION OF RAINWATER SYSTEM. · 2025-10-24
(1) NEW CABLED ELEVATOR. · 2025-10-21
Fire alarm plan check. Scope of work includes 1 FACP and 209 FA devices. · 2025-10-20
23042-10001-03181
Corrections Issued
****ATTENTION: PAULINA FIGUEROA***PLAN CHECK ONLY. REVISION TO ADD SEISMIC JOINT AND UPDATED HYDRAULIC CALCS. PREVIOUSLY APPROVED PLAN AND PERMIT UNDER #23042-10000-03181. ***DESIGN BASIS APPEARS TO BE UNCHANGED*** · 2025-06-13
Sheet E002:1. Change conduit sizes as per field condition.2. Change ground conductor size as per field condition.3. Change fully rated circuit breaker to series rating · 2025-05-14