23044-10001-28590
Verifications in Progress
***Original Plan Checker: Mathew Najera*** Revision to approved set of plans under delta 13 and delta 14. Revised equipment to A2L equipment. Revised two Type-I hood manufacturer, make, and model. Ductwork revision. · 2026-09-08
PLAN CHECK ONLY. REVISION TO FIRE SPRINKLER LAYOUT. REVISION TO PREVIOUSLY APPROVED PLAN UNDER 25043-10000-04892 · 2026-08-31
23016-10002-41127
Verifications in Progress
Supplemental Building Permit (#23016-10000-41127) needed due to field modifications. Relocation and type of exterior window and door and interior layout. · 2026-08-13
PLAN CHECK ONLY. ADDITION OF HEADS AND PIPING. ADDED SWAY BRACE CALCULATION. · 2026-08-04
Supplemental Permit needed due to existing field conditions for Delta 15: Removed circuit for FC-14. Revised homerun to connect to HP-7. Revised location for new mini-split system unit FC-12. E2.10, E2.20, E2.30, E3.10, E3.20, E3.30 Added access panels for all branch circuitry junctionboxes. Added circuit 28 in Panel K for new water fountain. Plan check only. · 2026-05-17
REVISION TO PREVIOUSLY APPROVED PLANS 23042-10000-24834. POTABLE WATER ONLY. · 2026-05-12
[EPLAN] SUPPLMENTAL PLAN CHECK ONLY. CLOUDED DELTA 10 CHANGES ONLY. CHANGES MADE TO LIGHTING AND POWER FLOOR PLANS, SINGLE LINE DIAGRAM, T24, LIGHT FIXTURE SCHEDULE, AND PANEL SCHEDULES · 2026-02-24
PLAN CHECK ONLY. REVISION TO PREVIOUSLY APPROVED PLANS UNDER #23042-10000-24834. INCLUDES REVISING POTABLE WATER RISER DIAGRAM. · 2025-12-11
GENERAL HVAC TI WITH VRF SYSTEM AND (2) TYPE-1 HOODS. · 2025-12-05
TI: ADD/RELOCATE SPRINKLER HEADS. · 2025-10-29
Complete tenant improvement renovation of the existing day Program Building. · 2025-10-03
PLUMBING TI. POTABLE WATER ONLY. EXISTING 2" METER WITH 2 1/2" BACKFLOW. · 2025-10-02