[E-Plan] Tenant Improvement With Non-load Bearing Partitions And New Interior Finishes.No Exterior New Work, No Change In Use And Building Occupancy. New 1200A 480/277V 3P 4W distribution board (3) 800A 240V 3P 3W LED LIGHT FIXTURES & LIGHTING CONTROL SYSTEM. GENERAL POWER FOR MACHINE SHOP EQUIPMENT. POWER FOR NEW HVAC EQUIPMENT. NEW PANELBOARD FOR NEW POWER CONNECTIONS. · 2026-09-10
[ePlan] Changes to approved T24 set. Revised panel schedules, floor plans, fixture schedule, T24 forms. PC for clouded changes only. · 2026-09-03
(EPlan) Revision to an approved set. TI Existing commerical building with an addition to a new 400A panel, transformers, and circuits. Address delta 4R clouded changes TENANT IMPROVEMENT AT EXISTING TRADE SCHOOL/WAREHOUSE BUILDING. CONVERT STORAGE (S-2)/PARTIAL OFFICE AREA (B) AND PROPOSED MANUFACTURING/WELDING SHOP (F-1) PREVIOUSLY SERVING AS AN ACCESSORY USE TO TRADE SCHOOL. · 2026-09-03
[Eplan] Revisions to approved set under delta 6. Attn: Francis Ysaguirre, Christopher Carbajal · 2026-09-03
AIR COMPRESSOR INSTALLATION · 2026-08-21
Field Evaluation of number of machines for UL Repair · 2026-08-20
Field Evaluation of 126 machines for UL Repair for DBC LLC - 7850 Haskell Avenue, Van Nuys, CA 91406 · 2026-08-20
Field Evaluation of number of machines · 2026-08-20
TI: Revision to approved plans. Adding and relocating fire sprinkler heads; NFPA 13 system. · 2026-08-04
T.I fire sprinkler. Add,replace, and relocate fire sprinkler heads. ( Change of use). · 2026-08-04
Connect Machinery · 2026-08-03
ePlanTitle 24 only tenant improvementSQ FT 2,340 · 2026-07-31
26043-20000-03564
PC Info Complete
ADD/RELOCATE SPRINKLER HEADS. NFPA 13 SYSTEM. · 2026-07-30
Install (2)electric trap primer, (1)electric water cooler, (2)floor drains, (2)floor sinks, (2)lavatories, (1)service sink, (2)mixing valves, (1)trap primer, (2)water closets, (1)water heater, (1)expansion tank, and (1)circulation pump · 2026-07-30
Plan check only. Submit hydraulic calculations. · 2026-07-29
Air compressor Installation · 2026-07-23
REPLACING FACP.UL CENTRAL STATION MONITORING, OF AUTOMATIC FIRE SPRINKLER SYSTEM ALSO INCLUDES MONITORING FOR FIRELITE HVAC DUCT DETECTORS WITH GLOBAL CONTROL OF FAN SHUTDOWN AND DAMPER. SUPERVISE MONITORING OF PIV TAMPERS · 2026-07-20
Install new compressed air piping with connections to owner furnished equipment. Relocate existing sink, remove and replace drinking fountain. Condensate piping to (2) units and some vacuum lines. · 2026-07-16
EPLAN SUPPL. TO PERMIT NUMBER 25016-20000-21684 FOR REVISIONS OF LUNCH ROOM AREA , (N) FIRE RATED SWING DOOR WITH MAGNETIC DOOR HOLDER, CONSTRUCTION DETAILS REVISED TO REFLECT EXISTING FIELD CONDITIONS, ALL WORK PER ENGINEERING · 2026-05-21