**2025 Wildfire Project** Early Start Foundation for 26010-10000-01817 2-story Elementary School campus, with an allowable increase of up to 10% in building footprint.The existing half level subterranean parking structurelargely unaffected by the firewill be retained and incorporated into the new design. Original building permitted in 1993. The above-ground program includes elementary classrooms, administrative offices, and play yards. · 2026-08-31
Installing (1) single phase 200a 120/240v overhead commercial meter for a temporary power pole. · 2026-08-13
26042-10000-08942
Corrections Issued
***WILDFIRE PROJECT****POTABLE WATER, WASTE/VENT AND STORM DRAINAGE SYSTEMS. 2" WATER METER, 2 1/2" BACKFLOW PREVENTER. Palisades Fire Rebuild of 2 story elementary school with existing to remain below grade parking garage. All existing electrical distribution system will be replaced with new.Application 1 of 2 for school campus. · 2026-08-13
26041-10000-20292
Corrections Issued
REPLACE ELECTRICAL SERVICE EQUIPMENT WITH NEW 1200A SERVICE 208/120V 3PH 4W DAMAGED BY FIRE. PROVIDE NEW DISTRIBUTION PANELS, BRANCH CIRCUIT PANELS, BRANCH CIRCUITING, RECEPTACLES, POWER CONNECTION FOR HVAC/PLUMBING/PV/TELECOM EQUIPMENT, AND PROVIDE NEW LUMINAIRE, LIGHTING, AND EMERGENCYLIGHTING PHOTOMETRIC FOR NEW SCHOOL BUILDING. PLAN CHECK FOR POWER AND ENERGY. · 2026-07-31
26010-10000-01817
Quality Review Completed
**2025 Wildfire Project** This project qualifies under executive order 1 for the palisades fire rebuild. It entails a like-for-like replacement of an existing two-story elementary school campus, with an allowable increase of up to 10% in building footprint. The existing half level subterranean parking structurelargely unaffected by the firewill be retained and incorporated into the new design. Original building permitted in 1993. The above-ground program includes elementary classrooms, administr · 2026-06-04