22016-10005-20113
Corrections Issued
Attn: Manuel Montufar; Supplemental to 22016-10000-20113 **Revisions to the fire life safety and egress plans to show doors removed and approved in previous permit/construction. · 2026-09-08
Supplemental to 22016-10000-20113 to capture relocation of LID bioretention basin. The LID bioretention basin did NOT change in size or depth, that remains the same. The LID was shifted entirely 4 ft , civil adjusted plans to shown the relocated LID. · 2026-08-17
[Eplan] Adding 39 FA devices to existing FA system. Update site plan, riser diagrams, and calculations.***Applicant Notes***modifications to existing approved fire alarm system · 2026-06-01
Make changes to the previously approved plan. Plan check only. Permit fees paid under 25043-10000-04111. · 2026-05-21
PLAN CHECK ONLY. REVISION TO PREVIOUSLY APPROVED PLANS UNDER #22042-10000-28199. UPDATED POTABLE WATER PIPE SIZING CHARTS AND UPSIZED PIPING THROUGHOUT RISER. NO CHANGE TO HYDRAULIC CALCULATIONS. · 2026-02-09
FIRE SPRINKLER TI, ADDITION AND RELOCATION OF HEADS. · 2025-11-25
Plan check for heating, venting, and air conditioning. · 2025-08-07
Plumbing TI for an existing building. Work includes water and waste & vent. 3" Water meter and 3" backflow. · 2025-07-23
[ePlanLA] Plan check for power only, change of use from hotel to multi-family dwelling units, newly connected load is over 400A, reuse the existing service 1,000A 120/208V, 3ph, 4W to supply dwelling units******Building Work Description ******** Renovation of existing 2-story Hotel/Motel to permanent Dwelling units (total 74 units) under SB35 - CA HCD; facility already has existing installed Roof Top - PV Solar System (390X330W DC PV Modules). · 2025-07-23