(EPlan) Full power plan check, changes to an approved set, loads removed and new chargers added. Revising the permitted vehicle battery charger configuration in response to a LADBS electrical inspectors correction notice. · 2026-08-28
[eplan] t24 energy only plan check for Remodel of Lighting & Electrical system. total square footage = 3551 sf · 2026-02-26
Plan check for methane mitigation system. Methane Design Level II. · 2026-01-07
E-plan, ***LAX*** Demolish the 5K-bbl vertical AST and dike area, decommissioned in 2020, and repurpose the area for a hydrant cart charging station. Demolish the south lift station, install a storm inlet and gravity drain into the existing system connected to LAWA's storm drain. Install two new 480/277 VAC distribution panels, decommission the existing MCC, and transfer loads. Install two new 480/277 VAC panels for hydrant charging stations and future storage/break room. Install a 200 EKW / 250 · 2025-08-25