25042-10004-01092
Verifications in Progress
*** OG PC = MARK ***REVISION TO PREVIOUSLY APPROVED PLANS UNDER #25042-10000-01092. ADDED DUPLEX SUMP PUMP SYSTEM. *** Supplemental to 25042-10000-01092, assign to Mark Wang. Collect permit fees for sump pump system per approved plan. **Project is BHCIP funded** *** · 2026-09-01
25010-10002-02764
Quality Review Completed
EPLANATTN STARR CHENSUPPLEMENTAL TO 25010-10000-02764 FOR DEFERRED SUBMITTAL FOR EXTERIOR OPENING FRAMINGEMAILED 7/28/26_STAR CHEN_EUGENE B***_ Exterior Framing deferred submittal supporting new Housing Building under 25010-10000-02764. **Project is BHCIP funded** · 2026-08-12
eplan Supplemental to 24010-10000-05387 for deferred submittal :Pedestrian and Vehicular Barrier Cable along the interior deck edge of the Kedren Childrens Village Parking Structure. Project is BHCIP funded. · 2026-06-11
Eplan Exterior framing deferred submittal to support new Outpatient Building under 25010-10000-00953. · 2026-06-03
Electrical installation of "Split Interlock" interconnect between FC-1, FC-2, FC-3 and FC-4 shown own permitted Mechanical drawings (208V). · 2026-06-01
Installation of 3" conduit & low voltage communication circuit to support temporary internet service. *Project is BHCIP funded* · 2026-05-06
Emergency Responder Radio Coverage System · 2026-05-01
GENERAL HVAC. INCLUDES OSHPD3 · 2026-04-30
Supplemental to #25044-10000-07770 for early startpermit (inspection prior to plan approval per approvedmodification). Single inspection only. Receipt # 2846333 OR MOD #22188 · 2026-04-28
[E-Plan] New Fire Alarm system (1) FACP, communication panel, and (216) FA Devices for new Building. · 2026-03-26
NEW PLUMBING. WORK INCLUDES POTABLE WATER, WASTE/VENT AND STORMWATER. 4" DOMESTIC METER WITH BACKFLOW. · 2025-12-08
PLAN CHECK ONLY. PERMIT UNDER 25043-10000-01789. REROUTE UNDERGROUND PIPING FOR FIRE HYDRANTS. · 2025-11-18
eplanService for 3 story Outpatient Buildng 800A 480/277V 3P, 4W service fed from 5000 A Swichboard. Lighting and full power plancheck. Performace method for T24NOTE:INTERJURISDICTIONAL, FEEDERS ROUTED THROUGH AN HCAI JURISDICTION BUILDING. · 2025-11-06
INSTALL HYDROELECTRIC ELEVATOR · 2025-10-16
[ePlan] New fire alarm system with 1 FACP,52 FD,3 CP***new housing building. Project is BHCIP funded. · 2025-10-02
Plan check for water, building sewer, and storm drain. · 2025-09-23
POTABLE WATER, WASTE/VENT AND STORM DRAINAGE. · 2025-09-23
[E-Plan] New 14,000 SF, 2-story residential building with 24 residential units, corridors, stairs, and utility rooms. Housing building supports the Kedren Children's Village. Project is BHCIP funded.THE PROJECT WILL DEVELOP A COMPREHENSIVE CHILDREN'S INPATIENT AND OUTPATIENT BEHAVIORAL HEALTH FACILITY. THIS PACKAGE IS ONLY FOR THE 2-STORY TRADITIONAL HOUSING BUILDING ALONG WITH RELATED SITEWORK PACKAGES. THE TRANSITIONAL HOUSING BUILDING WILL PRIMARILY BE CLASSIFIED AS A GROUP R-2 OCCUPANCY. · 2025-09-05
[ePlan] Central Station Signaling and elevator recall. Scope of work includes 1 control panel and 12 devices. · 2025-08-27
[ePlan] Plan check only. Supplemental to: 24041-10000-45131. Includes revisions to the single line and panel schedules to reflect correct equipment ratings and interconnections for new multi-level parking garage. Project is BHCIP funded. · 2025-07-30
INSTALLATION OF UNDERGROUND FIRE PROTECTION PIPING, INCLUDES (2) FIRE HYDRANTS. CONNECTION TO 10" FIRE SERVICE METERS WITH 10" DOUBLE CHECK BACKFLOW PREVENTER. · 2025-07-01
[EPLAN] FULL PLAN CHECK. Provide new 1200A 277/480V 3 Phase 4 Wire service for new multi-level parking garage. New lighting and power loads. Total square footage = 87117 sf · 2025-06-17
RAINWATER WITH SUMP PUMP. · 2025-06-17
ePlanLA 480V 3PH - 800A Temporary power service installation · 2025-05-14