[Eplan] Revisions to approved set. Originally, the restaurant was supplied by (2)200A @480volts; now it will be supplied by (1) 200A@480volts + (2) 200A 120/240volts, single phase. Emergency lighting will be connected to the building generator. One transformer and one panel have been removed, and two panels have been added. New branch circuits added. Outdoor lighting added.***Original application was approved for T24 Energy Only. Newly connected load now exceeds 400A therefore full plan check is · 2026-08-19
Change of contractor from MBF MASTER BUILDERS LLC to AKRAA CONSTRUCTION INC. · 2026-06-09
REVISION INCLUDES CHANGING LOW PRESSURE GAS TO MEDIUM PRESSURE GAS. PREVIOIUSLY APPROVED PLAN UNDER #24042-10000-11275. · 2025-11-20
INSTALLATION OF (2) TYPE I HOOD AND (2) TYPE II HOODS AND MAKE-UP AIR UNITS. · 2025-11-20
[ePlanLA] Title 24 Energy only. Total lighting area: 6,084 sq ft, newly connected load is less than 400A, T.I. New lighting and power system. · 2025-08-26
PLUMBING TI, INCLUDES POTABLE WATER, WASTE/VENT, AND LOW PRESSURE GAS. EXISTING WATER METER WITH 4" BACKFLOW PREVENTER. EXISTING BOOSTER PUMP. · 2025-08-21