[EPLAN] FULL PLAN CHECK FOR POWER AND ENERGY. SCOPE OF WORK INCLUDES: (1) 1200A (120/208V, 3PHASE, 4 WIRE) SERVICE, (2) 800A (120/208V, 3PH, 4W) SWITCHBOARDS. NEW PANELS, CIRCUITS, EQUIIPMENT, LIGHTING AND CONTROLS. TOTAL AFFECTED AREA IS: 45,590 SQUARE FEET.*************************************************8 New 60 unit multifamily mixed use building with a subterranean garage and 6 stories. · 2025-08-27
REVISIONS TO APPROVED PLANSCONVERTED REC SPACES TO 15 DWELLING UNIT; ADDED ELECTRICAL RANGES AND DRYER TO EACH DWELLING UNITS; NEW FIRE PUMP AND INVERTERS(((((([EPLAN] FULL PLAN CHECK FOR POWER AND ENERGY. SCOPE OF WORK INCLUDES: (1) 1200A (120/208V, 3PHASE, 4 WIRE) SERVICE, (2) 800A (120/208V, 3PH, 4W) SWITCHBOARDS. NEW PANELS, CIRCUITS, EQUIIPMENT, LIGHTING AND CONTROLS. TOTAL AFFECTED AREA IS: 45,590 SQUARE FEET.*************************************************8 New 60 unit multifamily mixed · 2025-08-27
Installation of 34 level 2 EV chargers to previously approved set l Partial permit approval. 12-22-2023 MZ[EPLAN] FULL PLAN CHECK FOR POWER AND ENERGY. SCOPE OF WORK INCLUDES: (1) 1200A (120/208V, 3PHASE, 4 WIRE) SERVICE, (2) 800A (120/208V, 3PH, 4W) SWITCHBOARDS. NEW PANELS, CIRCUITS, EQUIIPMENT, LIGHTING AND CONTROLS. TOTAL AFFECTED AREA IS: 45,590 SQUARE FEET.*************************************************8 New 60 unit multifamily mixed use building with a subterranean garage and 6 stories. · 2025-08-22
General HVAC and parking garage exhaust system. · 2025-08-04
Plan check for cabled elevators. · 2025-07-31
[EPLAN] NEW FIRE ALARM INSTALLATION WITH (1) FACP AND (185) DEVICES. · 2025-05-23