26041-10000-29516
PC Info Complete
(EPlan) Power plan check. Installation of 3 new panels to be connected to (3) existing services. Scope of work also includes the installation of new loads/branch circuits. Power for future illuminated digital signage on exterior of building. Signage under separate permit. · 2026-09-03
26016-10000-22874
PC Info Complete
INTERIOR RENOVATION (TI): NEW NON LOAD BEARING PARTITIONS, NEW ACT CEILING, LIGHTING AND FINISHES. NEW MILLWORK PANTRY AND COPY AREA. NO CHANGE OF USE. · 2026-08-26
PROVIDE AND INSTALL DATA INFRASTRUCTURE"COMPLY WITH DEPARTMENT ORDER effective date08/22/2019. PERMIT WILL EXPIRE 30 DAYS FROM ISSUANCE DATE". Allpermits shall be for the same time period limitation. Ifadditional assistance is needed, please call Inspector MIKE WANGat (213)252-3081 of ON-SITE SIGN ENFORCEMENT. CEIS Case Numberis 873319.(Created: IMSV7 / 08-15-19) · 2026-08-18
26016-10000-20542
Quality Review Completed
Eplan. Structural alteration to building facade for future signage support. · 2026-08-13
ROPE REPLACEMENT OF TOTAL 7 UNITS · 2026-07-20
HVAC scope includes (2) water source heat pumps with associated piping"COMPLY WITH DEPARTMENT ORDER effective date08/22/2019. PERMIT WILL EXPIRE 30 DAYS FROM ISSUANCE DATE". · 2026-06-01