Install 12 antennas one communicationpanel and 2 control devices (Das system) · 2026-08-31
21010-10004-03579
Quality Review Completed
Supplemental Permit to 21010-10000-03579Convert ground-floor bike room to recreation room; convert managers office + 3 compact parking stalls to bike rooms; subdivide 2nd-floor recreation room into two ADUs (new baths/kitchens) and relocate bike enclosure while reducing parking; convert 3rd and 5th floor recreation rooms to ADUs; revise open space and FAR. · 2026-08-03
[ePlanLA] Changes to an approved set of plan, changes include revised Single Line Diagram for add 800A distribution, revised EV load on panel, revised EV load to be on Future, update Elevation drawing, update Electrical room, update EV Circuit on floor plan. All changes has been clouded. 1-Revise the single line diagram and switchboard elevation detail 2-Revise Electrical room layout.3-Revised 5 EV installed and 8 for future. · 2026-03-03
[eplan] Supplemental to 23041-10001-37400. Revised lighting, singleline diagram, panel schedule, AC circuiting. new panel and lighting, and power loads · 2026-03-03
[EPLAN] INSTALL NEW 2000A 120/208V 3P 4W ELECTRICAL SERVICE, NEW DISTRIBUTION BOARDS, NEW PANELS, POWER AND LIGHTING FOR NEW APARTMENT BUILDING. · 2026-03-03
GENERAL HVAC. · 2026-02-18
SUPPLEMENTAL/REVISION TO APPROVED PLANS UNDER 23044-10000-08240. ADDITION OF CLOTHES DRYER VENTS, RELOCATING RESIDENTIAL HOODS IN DWELLINGS, AND REVISIING CORRIDOR VENTILATION. · 2026-02-12
NEW DOMESTIC WATER, WASTE/VENT, AND STORM DRAIN PLUMBING SYSTEMS. 3" WATER METER AND 3" R.P. BACKFLOW PREVENTER. · 2026-02-02
Installation of one new cabled elevator · 2026-01-29
(EPlan) Fire alarm plan check. Scope of work includes 1 FACP and 280 FA devices. · 2026-01-21
NEW NFPA 13 SPRINKLER SYSTEM WITH MANUAL STANDPIPES. 4-INCH FIRE METER WITH 4-INCH DOUBLE CHECK BACKFLOW PREVENTER. · 2026-01-14