(Eplan) Plan check only. Attn: Francis YsaguirreWe would like to change the emergency lighting P1 from the current fixtures to emergency bug-eye. Please see attachments and please let me know if you need anything else from us. · 2026-04-27
[EPLAN] Full Pc for power and energy to a new 6 story apartment building with amenity spaces. Scope of work includes new 2000 Amperes Service 120/208V, 3 Phase, Lighting, 99 unit panels and Power Plans. Total energy sq. ft. 20340 indoor and 11639 outdoor. · 2026-04-23
Install new plumbing system including potable water, waste and vent, gas, storm drain, and sump pump systems. 4" water meter and 4" RP backflow device. · 2026-04-16
FIRE SPRINKLER AND STANDPIPE SYSTEMS FOR APARTMENT BUILDING. 4" FIRE METER. 4" BACKFLOW DEVICE. · 2026-03-24
[E-Plan] Installation of new manual fire alarm system consisting of 1 FACP, 6 power supply units, 1 communicator, 1 annunciator and 209 devices. · 2026-03-17
Installation of 1 cabled elevator. · 2026-03-12
Plan check only. Addition of water curtain heads. · 2026-02-24
Plan check only for revision to an approved set under Delta 1 only. Scope of work includes changes to the lighting fixture layout.***Project description per applicant*** ATTN. Isaac Almaraz / Andrew DangRequest Expedite Submittal for this plan.Address: 6754 Valjean Ave - 99-unit apartment building, 100% affordable housing. Scope of Work: Updated Fixture Schedule, Title 24, Lighting Plan and Photometrics. · 2026-01-30
[E-PLAN] CHANGES TO AN APPROVED SET. REVISIONS TO SLD DISTRIBUTION SWITCHBOARDS, NOTES AND LOAD CALCULATIONSORIGINAL PERMIT SCOPE: 6 STORY MULTIFAMILY RESIDENTIAL NEW 2000A 208 3 PHASE SERVICEFULL PC · 2025-10-27
PLAN CHECK ONLY. PERMIT IS UNDER #22042-20000-28303. REVISED MODEL OF CENTRAL WATER HEATERS ONLY. · 2025-10-15
Plan check only. Change of pipe material from 1-1/4" CPVC to 1-1/2" black steel. Addition of sway bracing calculations. · 2025-09-17
UPDATE LOCATION OF MAIN WATER SUPPLY TO 1ST FLOOR GARAGE.PLAN CHECK ONLY. · 2025-06-04