(EPlan) PV2 for installation of roof mounted solar panels on commercial property. PV system includes 126 modules, 200A PV subpanel, and 2 central inverter system connected to existing 5000A main service panel. System size is 73.08kW DC/50.0kW AC. · 2026-09-09
plan check only. bracing cals for 2-inch CPVC pipe and 2 1/2 schedule 10 pipe. · 2026-08-24
26047-20000-01143
Quality Review Completed
ePLAN. (N) PUBLIC SWIMMING POOL PER ENGINEER · 2026-08-10
PLAN CHECK ONLY. changes to match as built. · 2026-08-10
26047-20000-01206
Quality Review Completed
ePLAN. (N) PUBLIC SPA PER ENGINEER · 2026-08-10
Plan check only. Re-check the new design of the plumbing system. Plan check for potable water, storm drain, sewage ejector and gas systems. *** See application comments*** · 2026-05-18
PLAN CHECK ONLY. REVISON TO REMOVE FIRE DAMPERS FROM FAN ROOM. PREVIOUSLY APPROVED PLAN AND PERMIT UNDER #23044-10000-29154. · 2026-05-06
26041-10000-08574
Verifications in Progress
(EPlan) Fire alarm plan check for Installation of a code compliant fire alarm system for a new R-2 residential apartment complex. Scope of work includes 1 FA control panel, 2 communication devices and 1032 FA devices. · 2026-04-16
(Eplan) Changes in approved electrical plans.Revision of Light design.Revision of Plumbing system.Revision of Electrical Vehicle Charging System**Attn Plan Checker: Francis Ysaguirre · 2026-04-02
new fire sprinkler system per NFPA 13. 6'' fire service, 6'' backflow device & PRV · 2025-11-25
[Eplan] Power only plan check. Installing (1) 1600A switchboard for a new temporary service, providing (6) 75kva transformers and (6) 200A panels. · 2025-11-20
plan check only. remove some sprinkler drains. · 2025-09-05
REVISIONS TO APPROVED PLANS: UPDATED SIZE OF BUILDING SEWER (CLOUDED LINES). · 2025-07-09
[eplan] New 6 Story, 405 Residential Units (+70 future units) + Amenities spaces over 3 levels of Parking Garage. Affordable housing.This building is NOT classified as HIGH RISE BUILDING.New (2) 5000 Amperes 120/208v, 3 Phase, 4 Wire services + (1) 1800 Amperes 277/480v, 3 Phase, 4 Wire service.Lighting and Power Plans.Title 24 Lighting compliance documents.Emergency Lighting.Application Building Permit # 21010-10000-04987 · 2025-06-06
PLAN CHECK ONLY. REVISION TO PREVIOUSLY APPROVED PLAN 23042-20001-22637. REVISION TO ELEVATIONS ON SITE PLANS. · 2025-04-16
Installation of new plumbing system including potable water, waste/vent, gas, rainwater ready, sewage ejector, and sump pump systems, medium pressure gas system. 10'' domestic service, 10'' reduced pressure principle backflow device, two PRV's · 2025-03-28