EPLAN Supplemental to permit #25016-20000-35665 to add Two details to resolve the slab void condition discovered during construction. · 2026-09-11
Core and shell for future. Work includes potable water, waste/vent, and medium pressure gas. · 2026-09-09
26042-20000-09769
PC Info Complete
Plumbing TI: Plan check for potable water, waste,vent, and medium pressure gas systems. · 2026-08-27
install conduits for future tenant Din Tai Fung · 2026-08-24
TI: ADD AND RELOCATE SPRINKLER HEADS. · 2026-08-18
26016-20000-12328
Verifications in Progress
Eplan Change of use from (E) 151'7" X 152'4-1/4" ( 16,012 SF) Retail to restaurant and tenant improvement to existing retail spaces within the Topanga Mall, all work per engineering · 2026-08-04
26044-20000-05647
Corrections Issued
Install new HVAC system including VRF system, (6) type-I hoods, (1) type-II hood and MAUs. · 2026-07-29
26041-10000-21073
PC Info Complete
[ePlan] Full PC for restaurant tenant improvement (change of use) to existing retail spaces and associated new electrical work. New sub panels, power equipment, circuits, lighting. Total affected area is 15,972 sqft. Newly connected load exceeds 400A.Building permit 26016 - 20000 - 12328 must be pulled prior to inspection. · 2026-07-21
EPLAN RECONFIGURE AND COMBINE CURRENT SPACES 1048, 1049, 1050, 1056, AND THE EXISTING MANAGEMENT OFFICE FOR RESTAURANT, SPACE #1050. PROVIDE A RAW CORE & SHELL SPACE FOR THE TENANT TO PROCEED WITH THEIR TENANT IMPROVEMENTS AND CHANGE OF USE FROM RETAIL/OFFICE TO RESTAURANT. · 2026-06-15
Plan check only. Revision to potable water and waste/vent riser diagrams (changes were clouded under DELTA 1). · 2026-06-03
26041-10000-00694
PC Info Complete
EPLAN, PROVIDING CORE AND SHELL SPACE INSTALLATION OF 800A FEEDER CONDUIT FROM EXISTING ELECTRICAL SERVICE FOR FUTURE CONNECTION. · 2026-01-27