3- Window and 3- door change-out (same size & type) for residential buildings. Dual glazing, labeled and certified byNational Fenestration Rating Council (NFRC), is required for doors and windows replaced in all residentialbuildings, three stories or less, per Section 150.2(b) 1B of Title 24.1- Kitchen1-bathroom remodel for residential buildings (no structural changes). "COMPLY WITH DEPARTMENT ORDER effective date03/19/2026. PERMIT WILL EXPIRE 30 DAYS FROM ISSUANCE DATE" · 2026-07-14
COMPLY WITH DEPARTMENT ORDER WITH AN EFFECTIVE DATE 3-19-26. PERMIT TO EXPIRE 30 DAYS FROM ISSUE DATE.Window -10 and 1-door change out (same size & type) for residential buildings. Dual glazing, labeled and certified by National Fenestration Rating Council (NFRC), is required for doors and windows replaced in all residential buildings, three stories or less, per section 150.2(b) 1B of Title 24.Kitchen and bathroom-2 remodel for residential buildings (no structural changes) · 2026-07-10