(Eplan) Full plan check. Change of Use, Tenant Improvement convert a portion of existing 1st floor suite to an A2 occupancy - event space with small warming prep kitchen and new restrooms. Total area 16, 569 sq ft. · 2026-08-28
FIRE SPRINKLER TI TO ADD/RELOCATE SPRINKLER HEADS. · 2026-08-18
26016-20000-18782
Quality Review Completed
CONVERT PORTION OF (E) 1ST FLOOR INTO AN EVENT SPACE, AND A PORTION INTO A VIDEO STUDIO WITH A WARMING PANTRY, NEW RESTROOMS, NEW STORAGE ROOMS, AND OFFICE TENANT IMPROVEMENT · 2026-08-14
(ePlan) REVISIONS TO AN APPROVED SET: REPLACED LIGHITNG CONTROLS SYSTEMS AND UPDATE NOTES · 2026-08-13
Install (28) VAV boxes, (1) ducted FCU, (1) wall-mounted FCU, (2) roof-mounted exhaust fans, (5) fire-smoke dampers, (30) 4' linear grilles, (43) return/ supply grilles, and associated ductwork. · 2026-08-10
26016-20000-18670
Quality Review Completed
UPGRADES TO (E) BACK ENTRY/LOADING AREA TO PROVIDE A NEW COMPLIANT ACCESSIBLE RAMP/ STAIR, (N) TRASH ENCLOSURE & (N) CHAIN LINK FENCE · 2026-08-07
[ePlan] Supplemental to approved plan set (25041-10000-36622). Adding 17 more FD. CHANGE ORDER (Adding 17 New Fire Alarm Devices):- ADD NEW FIRE ALARM DEVICES FOR CSFD SHUTDOWN FOR NEWREFLECTED CSFD'S PER MECHANICAL DRAWINGS.- ADD NEW NOTIFICATION DEVISE PER ARCHITECT CHANGES.- ADD NEW CONTROL RELAY FOR A/V SHUTDOWN IN THE MAIN MDFROOM 227 2ND FLOOR. · 2026-07-29
PLUMBING T.I. · 2026-07-10
Grading for new pad/vault and trenching for new electrical conduits. ***ELECTRICAL/MECHANICAL EQUIPMENT UNDER SEPARATE PERMIT*** · 2026-07-09
TENANT IMPROVEMENT TO (E) OFFICE SPACE ON 2ND FLOOR. · 2026-06-12
[ePlan] DELTA "3" Changes for adding Exit Signs in the common areas.No other new loads were added. · 2026-05-08
25041-10000-37624
Corrections Issued
(EPlan) PV for installation of roof mounted solar panels and installation of energy storage system. PV system includes 205 modules with 205 RSDs, 1 central inverter system, 1 battery, 1 load center, 1 PCS and 1 KMCP connected to existing main service panel. System size is 92.25kW DC/88kW AC. · 2025-12-30
25041-10000-42470
PC Info Complete
EPLANPOWER PLAN CHECK AND TITLE 24 ENERGY PLAN CHECK BESS INSTALLATION TO EXISTING 3000A 480V SWITCHBOARD::100 KVA EMERGENCY BATTERY INVERTER125KW - 560 KWH BESS 80 KVA UPS45 KVA XFMR100KVA XFMR · 2025-10-27
[Eplan] Phase 2 Core and Shell Building Improvements - Demolition and replacement of Electrical systemsNote: fire alarm devices and solar sytem equipment not part of this plan check. a separate permit shall be pulled for those equipments. · 2025-09-22
PLUMBING T.I. STORM WATER ONLY · 2025-09-18
(EPlan) Fire alarm plan check. Scope of work includes 1 FA control panel and 167 devices. · 2025-09-10
Plan check for heating, venting and air conditioning systems. · 2025-05-01
[E-Plan] Provide new power connection to new replacement of all HVAC system equipment in existing building and demolish all existing HVAC equipment back to source. · 2025-04-23