[ePlan] TI for the core restroom with EM. T24 Affected area is 591sf.**Applicant notes,TENANT IMPROVEMENT FOR CORE RESTROOMS ON 61ST FLOOR FOR LANDLORD. · 2026-09-11
26041-10000-35461
Corrections Issued
[ePlan] T24 only. TI commercial space. Scope of works, less than 400A connected load, new lighting receptacles, panel, branch circuits, and a transformer. T24 affected area is 10717sf.*Applicant notes, TENANT IMPROVEMENT OF OFFICE SPACE LOCATED ON 61ST FLOOR OF EXISTING HIGH RISE BUILDING (US BANK TOWER). · 2026-09-09
Commercial AV installation including wall-mounted displays, Logitech video conferencing systems, low-voltage Cat6 cabling, digital signage, and associated communications infrastructure. · 2026-09-08
26042-10000-14369
Corrections Issued
PLUMBING TI. POTABLE WATER AND WASTE/VENT SYSTEM. 6" DOMESTIC WATER METER AND 6" BFP · 2026-09-02
26041-10000-32859
Corrections Issued
[Eplan] Title 24 plan check for energy only. Partial tenant improvement with updated lighting controls, relocated lights, new lights and exit signs. Provided power to new mechanical equipment. Total affected area is 2304 sqft. · 2026-08-19
26041-10000-25950
PC Info Complete
(EPlan) Title 24 plan check for energy only. Scope of work includes new lighting fixtures, new lighting fixture controls, new power devices, and new circuits. Total area is 1,000 sf. · 2026-06-30
High-rise office space TI on 31st floor. New lighting, lighting controls, receptacles, circuits. Total affected area is 19,908 sqft. Plan check for EM lighting and T24 Energy. · 2026-05-19
Replace Drive on State # 091341 · 2026-05-14
Hoist Rope Replacement. Elevator # 091371 · 2026-05-14
GENERAL HVAC T.I. WITH EXSTING SMOKE EVACUATION SYSTEM. · 2026-05-07