Ch1A - ePlan. Install platforms with metal bar grating and 42" removable guardrails on open sides of the platforms on L20 through L30 inside North Mechanical Shaft; full height access door in shaft walls on L20 through L30; application of spray-applied fire-resistive material on new structural framing and repair fireproofing on existing structural members within the area of work. · 2026-09-11
26016-10000-20458
Quality Review Completed
Install new core & shell electrical power infrastructure, associated mechanical equipment, and support systems within existing landlord equipment rooms to serve future tenant spaces on Levels 2026. Future tenant improvements and connections to the core & shell power infrastructure will be submitted under separate permits. Work includes installation of new mechanical and electrical equipment in existing equipment rooms on P1, P2, L4, and L30; construction of a new equipment support platform on th · 2026-09-04
26041-10000-12143
PC Info Complete
(Eplan) Plan check for energy. DEMOLITION OF EXISTING LIGHTS AND RECEPTACLES ON FLOOR 18 AND REPLACEMENT WITH NEW "GRAY SHELL" LIGHTING. EM lighting and photometrics. Total area 2554 sq ft. · 2026-04-14
PLAN CHECK ONLY. REVISION TO RELOCATE DUCTS. PERMIT UNDER #25044-10000-10495 · 2026-04-14
25041-10000-57361
PC Info Complete
(EPlan) Title 24 plan check for energy only. Scope of work includes new lighting fixtures, new lighting fixture controls and new circuits. Total area is 1765 sf. · 2026-03-31
25041-10000-55476
PC Info Complete
(Eplan) Plan check for EM lighting/photometrics.Applicant Description: Remove existing lights in elevator. Disconnect existing devices in ceiling. Install new LED strip lights in ceiling. Reconnect previously disconnected devices. Provide new security camera. · 2026-01-21