**100% HSAP FOR REVIEW OF FLS, GREEN, ACCESSIBILITY AND STRUCTURAL (SB330/ED1)** The project scope includes the demolition of a vacant fire damaged residential building and the new construction of a 100% affordable 4-story Type VA residential multifamily building with 49 units including 32 one-bedroom, and 17 two-bedroom units (38 LI, 10 MI, & 1 MGR) and no parking, using AB 1763/ AB 2345 density bonus on and off-menu incentives, subject to streamlining per the Mayor's July 1, 2024 Executive Dir · 2026-09-11
POTABLE WATER AND WASTE/VENT. 3" DOMESTIC WATER METER. 4" BACKFLOW DEVICE. · 2026-06-26
[EPLAN] FULL PLAN CHECK Electrical design for a new 4 story low-income multifamily apartment complex. New 2000A service with distribution equipment, lighting, and power loads. total square footage = 11679 sf · 2026-06-19
GENERAL HVAC. · 2026-06-19
*EPLAN* Email 11/05/25 (Attn: Vu Nguyen /Scrn: Eugene Barbeau) Grading plan for 100% affordable project 25010-10000-01465 · 2026-05-20
** SUPPLEMENTAL TO 25010-10000-01465 FOR EARLY START FOUNDATION PERMIT CalOSHA permit must be obtained before construction is commenced · 2026-05-20
25041-10000-52181
Verifications in Progress
(EPlan) PV2 for installation of roof mounted solar panels and installation of energy storage system. PV system includes 96 modules with 96 optimizers, 2 central inverter system, 2 energy storage system, and 1 combining panel connected to existing main service panel. System size is 55.68kW DC/60.0kW AC. · 2026-04-30