Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solidsheathing __30____Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone(VHFHSZ). For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeledand certified by Cool Roof Rating Council (CRRC). Cool Roof may be required for non-residential buildingsper Title 24, Part 6, Section 141.0(b)2B."COMPLY WITH DEPARTMENT ORDER effective · 2026-08-28
22010-20001-04122
Quality Review Completed
*ePlanSuppl. permit number --- 22010-20000-04122, Changes work description to say " Convert existind detached garage to new ADU per LAMC 12.22A33(c) and (d); add walk-in closet, and patio cover." Include structural changes."COMPLY WITH DEPARTMENT ORDER effective date03/27/2025. PERMIT WILL EXPIRE 30 DAYS FROM ISSUANCE DATE" · 2026-06-02