Permits at 6000 W SANTA MONICA BLVD

18 permits on file · Los Angeles, CA · from the official municipal record

26024-10000-00004 Verifications in Progress

20 ft X10ft high retaing wall Addition of to an existing retaining wall · 2026-07-24

23014-10000-03526 Verifications in Progress

ADDITION TO AN EXISTING MAUSOLEUM · 2026-07-24

26020-10000-01579 Verifications in Progress

Shoring for a proposed Mausoleum addition under permit number 23014-10000-03526 · 2026-07-24

26030-10000-05383 Verifications in Progress

Proposed Grading for an addition to an existing Mausoleum. see permit 23014-10000-03526 · 2026-07-24

Temporary power generators and distribution for an Outside Concerts Series at (Hollywood Forever Cemetery 7/22/26 - 10/25/26) · 2026-07-16

Temp Power for event on 5/21/26 & 5/22/26. Inspection ready 5/20/26 by 2pm. Contact Gunny Troelstrup 708-860-9444 · 2026-05-19

Elevator Modernization · 2026-05-07

ELEVATOR MODERNIZATION · 2026-05-07

ELEVATOR MODERNIZATION · 2026-05-07

23041-10000-70914 Permit Finaled

[eplan] Fire Alarm system for (N) 5-STORY TYPE 1-A MAUSOLEUM/COLUMBARIUM BUILDING WITH ROOF TERRACE AT HOLLYWOOD FOREVER CEMETARY. Building ref#18010-10000-04525SCOPE OF WORK CONSISTS OF 1 FACP, 73 FA DEVICES, AND 1 COMM PANEL · 2025-09-02

18041-10002-35676 Permit Finaled

EPLAN. PLAN CHECK FOR POWER AND ENERGY. Changes to approved sets. Changes include: changed engineer, added subpanels and circuits · 2025-09-02

21043-10001-00374 Permit Finaled

Revision to approved plan. Addition of sprinkler heads and change of upright to pendant heads. · 2025-08-28

20042-10000-16235 Permit Finaled

NEW PLUMBING. POTABLE WATER AND STORM DRAINAGE. 1-1/2 INCH DOMESTIC WATE METER AND BACKFLOW. · 2025-08-21

24042-10000-03312 Permit Finaled

INSTALLATION OF DUPLEX SEWAGE EJECTOR SYSTEM. · 2025-08-21

21043-10000-00374 Permit Finaled

NEW NFPD 13 SYSTEM, 4" FIRE METER AND 4" BACKFLOW DEVICE · 2025-08-04

18041-10004-35676 PC Approved

Revision to approved drawings; Sheet E2.0. MS Load Calculation has been updated per electrical updates, Sheet E2.1. Panel schedules have been updated. Circuits have been removed, per lighting changes. Panel loads have been updated. Sheets E4.0-E8.0. Lighting has been updated. Changes have been clouded under revision B. Sheet E9.1. Title 24 energy calculations have been updated. P.C only. · 2025-07-16

18041-10003-35676 PC Approved

Loads for the MS, panel L, L1, and E have been updated, The lighting fixture schedule has been updated and clouded, T24 forms have been updated. Delta A. · 2025-06-15

23046-10000-00966 Permit Finaled

INSTALL (2) NEW CABLED ELEVATORS · 2025-05-01