eplan: change of use from retail space to learning center (E occupancy). New lights, new non-bearing interior partitions and new cabinets, finishes and 3 new openings in existing interior non-structural concrete wall per engineer's design. · 2026-05-28
[ePlan PV2] new PV System roof mount on commercial/apartment building:(82) Modules of 395 W, Total: 32.39 kWdc(1) Inverter of 30000 W, Total: 30 kWac2xStringPanel: (1) 200A (sub)***MPU to be under separate permit.*** · 2026-04-01
[ePlan] Plan check only. Supplemental. Changes include:LADWP Meter Socket Enclosure- added fused block and revised clip count from 15 to 7.Updated wire size for callout numbers 1.5 and 1.6 from #6 to #4 to match what is installed.ATTN: Anthony Dang · 2026-02-11
[ePlan] Full PC for a new 17-story high rise residential building with 302 units - 100% affordable housing. Scope of work includes new 4000A 480Y/277V 3ph service, 1200A 480Y/277V 3ph service, distribution boards, transformers, sub panels, power and lighting. Total affected area is 173,047 sqft.The screener took in one application for the Tower and Garage . An express permit wiil be required for the Garage .***Expedite per applicant request · 2025-12-23
[eplan] New Fire alarm system consisting of 1 FACP, 18 power supply units, 1 battery cabenit and 1171 devices. Accurate location 600 S SAN PEDRO ST 90013Installation of the new Edwards EST4 fire alarm control panels w/ voice evacuation systems in fire command center on level 1, installation of the new remote LCD annunciator located at main lobby, installation of new tel-guard TG-7FP wireless communicator in fire command center level 1 in FCR room, installation of new visual and audio-visual no · 2025-12-23
NFPA 13 FIRE SPRINKLER SYSTEM WITH STANDPIPES. 6" FIRE METER AND 6" BACKFLOW PREVENTER. · 2025-11-12
SITE FIRE. (2) 6" UNDERGROUND FIRE SUPPLY. · 2025-11-10
INSTALLATION OF SITE FIRE. (1) 6" UNDERGROUND FIRE SUPPLY. · 2025-11-10
NFPA 13 FIRE SPRINKLER SYSTEM INCLUDING STANDPIPES, FIRE PUMP, AND FIRE TANK. (2) 6'' FIRE METERS; (2) 6'' BACKFLOW PREVENTERS. · 2025-11-10
GENERAL HVAC, STAIR PRESSURIZATION AND SMOKE CONTROL FOR MAIN BUILDING. ALSO, INCLUDES PLAN CHECK FOR GENERAL HVAC AND PRODUCT CONVEYING FOR SEPARATE GARAGE BUILDING. GARAGE PERMIT FEES ARE UNDER #24044-10000-09040. · 2025-08-11
Request to expedite PLAN CHECK ONLYRevision to approved set under delta 6. Scope of work includes changes to lighting fixture schedule, Lighting Fixtures and lighting fixture controls layout, power device layout, single line diagram, and added circuits. Plan Check Only. · 2025-08-01
PLAN CHECK FOR POTABLE WATER, WASTE & VENT, STORM DRAINAGE, AND MEDIUM PRESSURE GAS PLUMBING SYSTEMS. INCLUDES 6" DOMESTIC WATER METER. 6" R.P. BACKFLOW PREVENTER, AND BOOSTER PUMP FOR TOWER. PLUS A 2" WATER METER AND 2" BACKFLOW FOR THE GARAGE. · 2025-07-25
INSTALLATION OF (2) TYPICAL CABLED ELEVATORS AND (1) NON-TYPICAL CABLED ELEVATOR. · 2025-07-15
Plan check for site storm drainage only. · 2025-06-11
[eplan] (2) 400A 480Y/277V 3ph-4w services, distribution, and power for construction temporary power. · 2025-06-10
Revision to approved set of plans. Plumbing alteration. Addition of 8 floor drains/sinks, 3 trap primers, 1 sand oil interceptor and 9 rain water drains. Original PCIS 23042-10000-09601 · 2025-05-06