Permits at 5901 W MELROSE AVE

25 permits on file · Los Angeles, CA · from the official municipal record

26048-30000-01529 Corrections Issued

EPLAN: New internally illuminated 2'-5" x 10' projecting sign** 2 of 2** · 2026-08-18

26048-10000-01309 Corrections Issued

EPLAN: New internally illuminated 3' x 5' wall sign** 1 of 2** · 2026-08-18

24044-10002-00059 Verifications in Progress

Make changes to the previously approved plan. Plan check only. Permit fees paid under 24044-10000-00059. · 2026-07-08

23016-10011-23726 Permit Finaled

Supplemental permit to 23016-10000-23726 floor plan revisions including to relocate DWP Switchgear and Elec room. · 2026-06-15

23016-10007-23726 Permit Finaled

SUPPLEMENTAL TO 23016-10000-23726 TO REVISE METHANE MITIGATION PLANS. · 2026-06-12

23016-10010-23726 Permit Finaled

Supplemental permit to 23016-10000-23726 to revise exterior storefront system to direct set window system. · 2026-06-12

23016-10005-23726 Permit Finaled

SUPPLEMENTAL PERMIT TO 23016-10003-23726. REVISION TO CLT FLOOR ASSEMBLY AT 2ND LEVEL. ARCHITECTURAL TO REFLECT STRUCT CHANGES. CIVIL DWGS FOR RE-ROUTED STORM WATER DRAINAGE AND BICYCLE PARKING AT SIDEWALK, ALCOHOL USE PER CUP. · 2026-06-12

23016-10006-23726 Permit Finaled

(eplan) SUPPLEMENTAL TO PERMIT #23016-10003-23726 TO REVISE STRUCTURAL FOUNDATION AND MINOR STEEL ATTACHMENT DETAILING DUE TO CONSTRUCTION FIELD CONDITIONS. UPDATING CMU/URM WALL ANCHORAGE TO DIAPHRAGMS. · 2026-06-12

23016-10008-23726 Permit Finaled

*eplan* Supplemental to permit #23016-10000-23726. Structural scope only:Revised mechanical units on roof, supports adjusted as neededMiscellaneous detail updates per on-site conditions · 2026-06-12

26041-90000-24239 Permit Finaled

Low Voltage Network Cabling · 2026-06-12

25046-10000-01999 Permit Finaled

INSTALLATION OF A WHEELCHAIR LIFT. · 2026-06-12

23016-10003-23726 Permit Finaled

(eplan) SUPPLEMENTAL TO PERMIT #23016-10001-23726 TO REVISE STRUCTURAL DESIGN FOR 2ND FLOOR DIAPHRAGM SYSTEM TO USE CROSS LAMINATED TIMBER FLOORING (CLT) · 2026-06-12

23041-10001-74458 Permit Finaled

[ePlan] Changes to approved set. Updates size of main distribution panel and updated breakers. Added panel K1 and A. Added panel schedule for panel AC. Updated size of transformer TP1. Revised power and lighting floor plans. PC for clouded changes only. · 2026-06-10

25042-90000-11834 Permit Finaled

new plumbing · 2026-06-10

23042-10001-25559 Permit Finaled

REVISION TO PREVIOUSLY APPROVED PLAN 23042-10000-25559. ADDITION OF FIXTURES AND REVISION TO POTABLE WATER, WASTE/VENT, AND LOW PRESSURE GAS. NO CHANGE TO HYDRAULIC CALCULATIONS. · 2026-06-10

25042-10000-17309 Permit Finaled

NEW METHANE MITIGATION LEVEL II. · 2026-06-10

23041-10000-74458 Permit Finaled

[E-Plan] TENANT IMPROVEMENT INSTALL NEW 600AMPS 120/240V 3P 4W ELECTRICAL SERVICE. CHANGE OF USE to Restaurant/Bar. FULL PLAN CHECK. · 2026-06-10

23041-10002-74458 Permit Finaled

[ePlan] Revisions to 23041-10000-74458 delta 1 added new circuits and updated electrical room. · 2026-06-10

24041-90000-10576 Permit Closed

Install temporary 200 amp power pole. · 2026-06-08

25041-10000-46908 Permit Finaled

[EPLAN] INSTALLATION OF A NEW STAND-ALONE FIRE ALARM SYSTEM WITH (1) FACP AND (40) FA DEVICES. · 2026-06-05

26042-10001-06533 PC Approved

PLAN CHECK ONLY. PERMIT UNDER 26042-10000-06533. RESTAMP DUE TO LOST PLANS · 2026-06-04

INSTALL NEW DUPLEX SUMP PUMP SYSTEM. · 2026-06-04

24043-10000-01139 Permit Finaled

NEW NFPA 13 SPRINKLER SYSTEM. 4-INCH FIRE METER. · 2026-05-27

26044-10000-04746 Quality Review Completed

Make changes to the previously approved plan. Plan check only. Permit fees paid under 24044-10000-00059. · 2026-05-12

24044-10001-00059 PC Approved

Make changes to the previously approved plan. Plan check only. Permit fees paid under 24044-10000-00059. · 2026-03-04