Swapping out flooring material only. no mechanical mods ( 1- misc ) · 2026-08-06
PROPOSED CHANGE OF USE FROM TV PRODUCTION STAGE TO OFFICE INCLUDING TENANT IMPROVEMENT, NEW INTERIOR PARTITIONS, MILLWORK, ROOFTOP EQUIPMENTS AND FOUNDATION PADS. NEW EXTERIOR ENTRY STAIR AT EXISTING EXTERIOR ENTRY. · 2026-06-18
[EPLAN] Tenant improvement to existing retail space level 1 building. Provide new circuits, new power, panels, distribution board, new generator unit, HVAC and lighting. Plan check for power and energy. · 2026-06-12
[E-PLAN] REPLACEMENT OF EXISTING DISTRIBUTION BOARD 1000KVA 2.4KV:480V XFMRNEW DISTRIBUTION BOARD 3000A 480V 3PH 3W. There are no new loads added. All the existing loads are reconnected to the board. · 2026-06-04
SUPPLEMENTAL TO 25016-10000-18502. NEW GENERATOR FENCING SCREEN ENCLOUSRE TO INCLUDE NEW STRUCTURAL POST FENCE SUPPORTS AND NEW SLAT SCREENING. NEW EXTERIOR STAIR HANDRAIL & GUARDRAIL AT EXISTING EXTERIOR ENTRY RAMP AND STAIRS. NO CHANGE TO EXISTING GENERATOR PAD. NO CHANGE TO EXISTING RAMP AND STAIR. NO CHANGE TO EXISTING ASSOCIATED BUILDING SHELL. · 2026-05-12
GENERAL HVAC T.I. · 2026-04-20
GENERAL EXHAUST · 2025-09-05
[Eplan] TI-24 only, PARTIAL TENANT IMPROVEMENT OF 2ND FLOOR EXISTING BUILDING OFFICE SPACE WITH INCLUSION OF FOOD SERVICE AREA, DINING AREA, LOUNGE AREAS WITH NEW LIGHTING AND KITCHEN EQUIPMENT. PLAN CHECK FOR ENERGY. · 2025-08-12
(EPLAN): SUPPLEMENTAL PERMIT FOR PARTIAL TI OF 2ND FLOOR EXISTING BUILDING. UTILIZING NEW PANELBOARDS NEW XFMR FED FROM EXISTING POWER DISTRIBUTION FOR KITCHEN POWER AND LIGHTING. PLAN CHECK ONLY · 2025-05-12
[E-Plan] T-24 plan check. Tenant Improvement of the Netflix corner area on Level 2. Total area is 7,558. · 2025-03-21