26016-10000-23311
Submitted for Quality Review
ePLAN TENANT IMPROVEMENT TO (E) HOTEL. PARTIALLY DEMOLISH POOL DECK, SOUTH STAIRS, & RAMP. INSTALL NEW DECK, ADD NEW RAMP. NEW GUARDRAIL SYSTEM AND POOL ENCLOSURE TO BE INSTALLED. NEW POOL SHOWER. REMOVE AND IN-FILL EXISTING SOUTH JACUZZI SPAS · 2026-09-09
EPLAN: Renovation of existing non-accessible, accessible guestrooms and corridors. · 2026-06-24
pLAN CHECK FOR POWER AND t-24 Renovation of Guestrooms Includes:A- Guestrooms total in 1243 units1- All outlets in the guestrooms areas are existing to remain.2- All Branch circuits are existing to remain.B- Bathrooms1- Remove the vanity wall sconces. Re-work existing branch circuit for the new LED illuminated Mirror. 2- Provide J-box for the hardwire LED night light with Motion sensor under the replaced vanity. 3- Replace lighting switch with wall switch/vacancy sensor as indicated in the bathr · 2026-06-04
[ePlan] (PC ONLY) Changes to approved set. Deleted specific note 4; deleted under counter light in bathroom; changed graphics of existing to remain electrical devices to background color; edited note 16 to hardwire the make-up mirror new j-box. Clouded changes only. · 2025-08-31
TENANT IMPROVEMENT. UPDATING THE GAS PRESSURE REGULATOR MAKE AND MODEL ON THE MEDIUM PRESSURE GAS SYSTEM. · 2025-08-12