RAINWATER HARVESTING SYSTEM. · 2026-09-03
(EPlan) Plan check only, Changes to an approved set, no new equipment just updating protection devices.Atten; Katrina Robles Attn: Katrina Robles.This supplemental plancheck application revises the main 34.5kV service disconnect/overcurrent protection from a fuse to a VCB and relay to provide better protection. No other changes to previously approved plancheck submissions. · 2026-07-14
REVISION TO APPROVED PLANS. REVISE DUCTWORK AND AC UNITS MAKE/MODEL. CHANGE TO A2L REFRIGERANT. · 2026-03-31
(Eplan) Supplemental permit submission. Submitted changes document tenant improvement on level P1, level 1, level 2, and level 3 of the east tower. New panelboards, circuitry, receptacles, lighting, and mechanical equipment. · 2026-03-30
REVISION TO APPROVED PLANS . REVISION TO POTABLE WATER AND RAINWATER SYSTEM. · 2026-03-10
Plan check only. Addition of fixtures and changes to previously approved plans. Permit fees paid under 22042-10000-17021. · 2025-12-16
REVISION TO PREVIOUSLY APPROVED PLANS UNDER 22044-10000-09673. INCLUDES UPDATING MECHANICAL EQUIPMENT MAKE/MODEL AND DUCTWORK REVISIONS. · 2025-10-03
[ePlan] Lighting Fixture FC-5 updated per RFI 551. Updated performance forms to match latest mechanical changes. Updated feeder schedule, Updated breakers, feeders, and disconnect sized for ACCU units. Revised power for overhead coiling doors, Circuit breakers updated per mechanical equipment. · 2025-08-29
Revision to approved plans. Changes to potable water, waste/vent, storm, and gas. Rainwater harvesting supplemental under 24042-10000-22220. · 2025-06-17
[ePlan] (PC ONLY) Changes to approved set 24041-10001-59649 to include performance method T24 compliance forms. No change to lighting floor plan. PC for clouded changes only. · 2025-03-25