[NDC-6363] VERIFICATION AND REVIEW OF BUILDING RECORDS AND ENGINEER'S REPORT FOR EXEMPTION FROM MANDATORY NON-DUCTILE CONCRETE BUILDING SEISMIC RETROFIT ORDINANCE. APPROVED: YES/NO · 2026-09-11
[NDC-6364] VERIFICATION AND REVIEW OF BUILDING RECORDS AND ENGINEER'S REPORT FOR EXEMPTION FROM MANDATORY NON-DUCTILE CONCRETE BUILDING SEISMIC RETROFIT ORDINANCE. APPROVED: YES/NO · 2026-09-11
Supplemental permit to 26042-90000-14626 to Install (1) Kitchen Sink and (1) water using device · 2026-09-09
[Eplan] Title 24 plan check for energy only. Renovation and expansion of existing prop exhibit. Demo/Relocation of some existing panels. New and existing power devices to be refed by new 120/208V panel. New lighting fixtures and controls provided, EM lighting by integral battery. Total area is 5758 sqft. · 2026-09-08
[Eplan] Title 24 plan check for energy only. Addition of new electrical outlets and lighting fixtures for two floors of an exhibit gallery. As well as one single use restroom on the second floor. Total area is 2440 sqft. · 2026-09-08
INSTALL SINK, ICE MAKER,AND BAR · 2026-08-31
Installation of low voltage intrusion and cctv equipment. · 2026-08-25
Supplemental to include structural for a 2 story TI due to field conditions · 2026-08-25
26016-10000-21508
Corrections Issued
eplan: Tenant Improvement to Archive Gallery Building 330 to include new partitions, doors and new exterior entry door per engineer calc · 2026-08-21
Tenant Improvement. Add or relocate fire sprinkler heads based on new floor plan and reflected ceiling plan. · 2026-08-17
Install new disconnect for elevator controller. Install (3) smoke detectors · 2026-08-13
Furnishing and installing a new split-system fan coil unit, associated supply/return ductwork, air distribution devices, outside air connection, and refrigerant piping · 2026-06-29
ePlan:TENANT IMPROVEMENT IN AN EXISTING OFFICE BUILDING · 2026-06-29
Tenant Improvement: New 100A Panel, interior lighting, lighting control, egress lighting, branch circuit wiring, power to HVAC unit and instant water heater · 2026-06-18
Install new 60A disconnect for 10hp material lift · 2026-06-17
Install power to (4) new AHUs and 73 VAVs · 2026-06-10
PROPOSED CATWALK AND ROOF LEVEL DUCT OPENINGS FOR (N) ROOFTOP EQUIPMENT. · 2026-05-22
HVAC T.I. INCLUDES ADDING A NEW UNIT AND DUCTWORK. · 2026-05-14
INSTALL NEW NFPA 13 SPRINKLER SYSTEM. EXISTING 8" FIRE METER, EXISTING 8" BACKFLOW PREVENTER. · 2026-03-25
GENERAL HVAC T.I. INCLUDES ADDING/REPLACING VAV BOXES AND AIR HANDLING UNITS. · 2026-03-17
NFPA 13 FIRE SPRINKLER SYSTEM. (E) 8" FIRE SERVICE WITH 8" DC BACKFLOW PREVENTER. · 2026-03-13
[ePlan] upgrade FA, Modernization upgrade to the existing halon 1301 fire suppression system. Replacement releasing control panel and devices with an addressable releasing control panel and devices. of existing halon 1301. · 2025-09-19
25041-10000-35567
PC Info Complete
[ePlan] T24 energy only PC for commercial space TI. Total affected area is 953 sqft. FURNISH AND INSTALL ALL ELECTRICAL WORK INDICATED ON THE DRAWINGS AS SPECIFIED AND AS NECESSARY TO PROVIDE A COMPLETE INSTALLATION. NEW 100A, 120/208, SINGLE PHASE, 3W PANEL, INTERIOR LIGHTING AND LIGHTING CONTROL SYSTEMS, POWER TO NEW HVAC UNIT AND INSTANT WATER HEATER COMPLETE BRANCH CIRCUIT WIRING INCLUDING LIGHT FIXTURES, OUTLETS, DEVICES, MATERIALS, ETC., FOR A COMPLETE INSTALLATION. EXISTING OUTLETS AND W · 2025-08-01
E-plan, Equipment replacement including new transformer, panelboards, and equipment. The 2.4KV utilityservice is existing remains unchanged no new loads being added. Plan check for power. · 2025-06-27