**emailed on 8/25/2026** **Attn: Kevin Morales/Eugene** supplemental to 25030-10000-00946Revisions to storm drain connection relocation and the sewer lateral · 2026-08-29
[ePlan] DELTA "7" Changes only. Due to EV Load reduction, revisions include: Updated load summary and revisions to main breaker, wire, conduit size, and KAIC rating. · 2026-05-18
++Prev PC: MIKE SHAHRESTANI+++ REVISIONS TO PREVIOUSLY APPROVED PLANS. CHANGES TO POTABLE WATER AND WASTE/VENT SYSTEMS. MINOR RISER REVISIONS OF TWO UNITS. · 2026-04-10
[ePlan] Plan check only. Supplemental. Revised layout for 2-BR Managers Unit #236B. · 2026-03-18
Revisions to approved set to update the load summary, feeder schedule, breakers, added disconnect switch, revised plan location. cloud revisions Delta 5. · 2025-11-30
*** (ED1) ASSIGN TO NIZELLE - 100% affordable housing project** NEW PLUMBING PLAN CHECK FOR POTABLE WATER AND WASTE/VENT. INCLUDES 4" WATER METER AND 6" BACKFLOW DEVICE.(The Project proposes the adaptive reuse of two (2) existing office. New plumbing systems. (PC TO VERIFY IF ALL ELECTRIC BUILDING APPLIES) 24010-10000/1-03092.) · 2025-09-29
******100% affordable housing project********Install 1200 amps 277/480V 3P 4W electrical service new distribution boards panels power and lighting for a conversion of office space to 116 residential units · 2025-09-25