(EPlan) Title 24 plan check for energy only. Scope of work includes new lighting fixtures, new lighting fixture controls, new power devices, and new circuits. Total area is 10,618 sf. · 2026-09-09
[ePlan] Supplemental to 24041-10001-18242. Revisions include: area of work increased, more lights and circuits added · 2026-09-09
[eplan] INTERIOR REMODEL OF SECOND FLOOR EXISTING AUTO DEALERSHIP SHOWROOM BUILDING. PLAN CHECK FOR ENERGY/TITLE-24. · 2026-09-09
[ePlan] Supplemental plan revised plan to previous approved plan set (24041-10000-27812). Adding branch circuits.#### Attention Jyll Hernando. Supplemental permit to permit no. 24041-10000-27812 to update panel schedule and provide photometric calcs and interconnected wiring between all devices in each branch circuit from any panelboard to the last deviceOriginal plan not approved yet, suplemental requested by Jyll. · 2026-09-09
Low-voltage structured cabling · 2026-09-09
26044-10000-01003
Corrections Issued
*** A2L REFRIGERANT ***GENERAL HVAC. PRODUCT CONVEYING SYSTEM. · 2026-09-08
PLUMBING TI. POTABLE WATER ONLY. EXISTING 2" METER AND BACKFLOW. · 2026-09-03
2 new earthquake shut off valves · 2026-09-03
Alterations to existing fire alarm ssytem. New FACP, cell communicator, annunciator, and (7) signaling line/notification devices. · 2026-09-01
GENERAL HVAC TI · 2026-08-26
TENANT IMPROVEMENT. FIRE SPRINKLER ADDITION AND RELOCATION OF FIRE SPRINKLER HEADS. · 2026-08-25
26043-10000-03509
Quality Review Completed
FIRE SPRINKLER SITE PLAN TO INSTALL (3) NEW PRIVATE HYDRANT AND NEW UNDERGROUND PIPING. X" FIRE METER, X" BFP · 2026-08-19
26042-10000-02053
Corrections Issued
INSTALLATION OF NEW PLUMBING SYSTEM. INCLUDES POTABLE WATER, WASTE/VENT WITH OIL INTERCEPTORS AND A PUMP SYSTEM SERVING THE ELEVATOR PIT · 2026-08-18
26041-10000-28064
Quality Review Completed
(EPlan) PV2 for installation of roof mounted solar panels. PV system includes 640 modules, 1 combiner panel and 8 central inverter system connected to existing main service panel. System size is 377.6kW DC/266.4kW AC. · 2026-08-17
REVISION TO PREVIOUSLY APPROVED PLANS UNDER # 24044-10000/1-09794. INCLUDE 1ST FLOOR AS PART OF PLAN CHECK WITH GENERAL HEATING, COOLING, AND VENTILLATION, REVISE DUCTWORK, AND ROOF PLANS. · 2026-07-24
26010-10000-02929
Quality Review Completed
Construction of new structure for EV/ Battery for new car dealership. Associated with building permit no. 25010-10000-05659 · 2026-07-02
26010-10000-02928
Quality Review Completed
Construction of new trash enclosure structure as part of new automobile dealership. Associated with building permit no. 25010-10000-05659 · 2026-07-02
26041-10000-00980
PC Info Complete
[E-Plan] New BMW service and parking facility NEW 2,500A 480/277V 3PH 4W SERVICE, POWER, LIGHTING,AFFECTED AREA IS 68,108 SQFT. · 2026-06-03
PLAN CHECK ONLY. REVISION TO PREVIOUSLY APPROVED PLANS UNDER #25043-10000-04331. PER INSPECTION REQUEST, ADDED SWAY BRACING. · 2026-06-03
REVISIONS TO POTABLE WATER HYDRAULIC CALCUATION AND PIPE SIZING. PREVIOUSLY APPROVED PLAN AND PERMIT UNDER #24042-10000-10623. · 2025-11-18
PLAN CHECK ONLY. SUPPLEMENTAL TO 24044-10000-09794 TO REVISE DUCTWORK AND ROOF PLANS · 2025-07-22