26014-10000-02811
Quality Review Completed
Eplan. Construction of a new pergola and column. · 2026-08-28
26016-10000-03025
Verifications in Progress
EpLAN: Proposed change of use from retail to restaurant core and shell for two tenant spaces. Work includes construction of a new load-bearing demising wall separating ; new storefront doors and windows; installation of new accessible ramps; new HVAC units; installation of a new skylight; restriping of the parking lot. · 2026-08-05
26030-10000-03136
PC Info Complete
<ePLAN>GRADING WORK TO INSTALL A GREASE INTERCEPTOR · 2026-07-22
26010-10000-02171
Quality Review Completed
Eplan: Construction of a new detached covered trash enclosure · 2026-06-09
26041-10000-13157
Quality Review Completed
(EPlan) Full plan check for shell building work. Scope of work includes new 800A service. Total area is 6,510 sf.Note to plan checker: Check addressApplicant description: Tenant improvement of an existing retail space to accommodate future restaurant tenants. Work includes construction of a new load-bearing demising wall separating Units 511 and 513; new HVAC units for future tenants; new exterior lighting and installation of a new electrical switchboard, meters, and electrical panels. · 2026-04-30
26044-10000-01262
Corrections Issued
HVAC T.I. ADDITION OF ENVIRONMENTAL VENTILATION AND ROOFTOP UNITS WITH A2L RERIGERANT ***TI OF an existing retail space to accommodate future restaurant tenants. BLDG PERMIT SUBMITTED AFTER 1/1/2026** · 2026-04-29