22010-20000-06171
CofO in Progress
***EPLAN. SEVEN STORY TYPE I-B NEW FRANCHISE AUTOMOBILE SALES WITH VEHICLE REPAIRS, VEHICLE PARTS & TIRE STORAGE & ROOF PARKING DECK. · 2026-09-01
Defferred Submittal for Installation of automotive air and lube equipment. This submittal is a differed submittal for a current TI plan check number B22VN18299. · 2026-08-27
EPLAN Deferred submittal to permit # 22010-20000-06171 for proposed portion of exterior wall framing for level 7 signage walls · 2026-08-27
Eplan - Supplemental to Permit # 22010-20000-06171 To install One New ( 34' x 4' ) Type I-B Trellis system at front of building facing Washington Blvd.. · 2026-08-27
Two-way communication system installation complying with sections 1009.8.1 and 1009.8.2. · 2026-08-27
Supplemental permit to 26041-20000-02786 for change in address from 501 W Washington Blvd to 509 W. WASHINGTON BLVD_. No change in legal.Supplemental permit to 26041-20000-02786 to add the following equipment change: 95 communication devices, 1 communication panel and 100 control devices. · 2026-08-27
Installation of an tail pipe exhaust system. · 2026-08-24
REVISED SERVICE LOAD CALCULATIONS, ADDED LIGHT FIXTURE, ADDED CIRCUITS, REVISED EQUIPMENT LAYOUT IN ELECTRICAL ROOM, UPDATED BACKGROUND IN COORDINATION changes on delta 6.Please update address to 509 W Washington Blvd · 2026-08-13
SUPPLEMENTAL PERMIT TO #22041-10002-65529 TO CHANGE ADDRESS FROM 509 W WASHINGTON BLVD 90007 TO NOW READ 509 W WASHINGTON BLVD 90015 · 2026-08-13
Supplemental permit to 22044-20000-15879Change of Address Permit from [ 501 W Washington Blvd. ] to [ 509 W Washington Blvd. ]No work added ( 03/06/2025) · 2026-08-10
SUPPLEMENTAL PERMIT 22044-20000-15879 TO ADD: (14) WITNESS TESTS. · 2026-08-10
REVISIONS INCLUDE ADDING EXHAUST FAN, CFSDs, LOUVERS AND RELOCATING DUCTWORK. PREVIOUSLY APPROVED PLAN UNDER #22044-20001-15879. · 2026-08-10
SUPPLEMENTAL PERMIT 22044-20000-15879 TO ADD: (14) WITNESS TESTS. · 2026-08-10
EPLAN. (3)-FORD OVAL WALL SIGN (31 SQ. FT.) EACH SIGN IS 4'2-1/8" X 9'-7" AND ILLUMINATED. EACH SIGN IS 94'-6" ABOVE GRADE · 2026-06-12
INSTALLATION OF POTABLE WATER AND WASTE & VENT SYSTEMS. 8" METER, 8" DCDA BACKFLOW DEVICE AND BOOSTER PUMPS. · 2026-06-01
(49) Automotive Lifts and (2) Compressors. · 2026-04-29
INSTALLATION OF NFPA 13 SYSTEM. INCLUDES FIRE TANK AND FIRE PUMP. 8" FIRE METER, 8" BACKFLOW. · 2026-04-15
NEW CABLE ELECTRIC ELEVATOR. · 2026-04-07
New cabeled electric elevator. · 2026-04-07
[ePlan] Power plan check for Temp Power. New 600A 480/277V 3PH 4W service, buc hoist, tower crane, 250A sub panel, and 75kVA XFMR. · 2026-02-19
Install new storm drainage system including site storm drainage pipe(s). · 2026-02-17
Methane mitigation system design level II. · 2025-10-23
Revision to approved plans (Changes under Delta 6).1. Added additional sprinkler heads under HVAC ducts larger than 48".2. Revised tire storage and part storage area per revised floor plan (Sheet FP-7).3. Revised sway brace calcs per field installations.FP-1 head legendFP-3 head under HVACFP-5 head under HVACFP-7 head under HVAC, part and tire storageFP-15 Brace calcs · 2025-06-12