New 200A 480/277 3PH 4W for MCC: Underground stormwater diversion, pretreatment, and infiltration gallery within Valley Village Park, including slide gate electric actuator. Project owner - LABOE/LADWP. Property owner is Department of Recreation and Parks. · 2026-09-09
26020-20000-01533
Quality Review Completed
**ePlan** Proposed underground stormwater diversion, pretreatment, and infiltration gallery within Valley Village Park. The infiltration gallery is approximately 100-ft wide by 282-ft long. Depth of excavation is approximately 27-ft. Project owner is LABOE and LADWP (collaboration). Property owner is Department of Recreation and Parks.*PCE TO GENERATE ADDITIONAL GRADING PERMIT* · 2026-08-18
26030-10000-06030
Quality Review Completed
**ePlan** PROPOSED GRADING FOR UNDERGROUND STORMWATER DIVERSION, PRE-TREATMENT, AND INFILTRATION GALLERY WITHIN VALLEY VILLAGE PARK. THE INFILTRATION GALLERY IS APPROX 100' WIDE X 282' LONG. DEPTH OF EXCAVATION IS APPROX 27'. CUT = 44,796 CY, FILL = 29,711 CY, EXPORT = 15,705 CY. 2 OF 2 · 2026-08-18